-
Notifications
You must be signed in to change notification settings - Fork 2.1k
Pull requests: openshift/release
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
Add CI presubmit config for cluster-health-analyzer release-1.1
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
#75817
opened Mar 6, 2026 by
DavidRajnoha
Loading…
WIP OCPBUGS-77895: Increase memory and VCPU for agent tests
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#75816
opened Mar 6, 2026 by
bfournie
Loading…
NO-JIRA: feat(tnf): add resource-agents steps under baremetalds/two-node/fencing
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#75815
opened Mar 6, 2026 by
jaypoulz
Loading…
Add hypershift-jira-solve-ci[bot] as trusted app for openshift/hypershift
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#75814
opened Mar 6, 2026 by
bryan-cox
Loading…
OCPBUGS-45921: Use HighlyAvailable infra policy for HyperShift serial conformance tests
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#75813
opened Mar 6, 2026 by
alebedev87
Loading…
debug build-farm job failure
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#75811
opened Mar 6, 2026 by
mcornea
Loading…
Various improvements to Claude payload step
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
tide/merge-method-squash
Denotes a PR that should be squashed by tide when it merges.
#75810
opened Mar 6, 2026 by
stbenjam
Loading…
Switch openshift-service-mesh configs from hypershift to IPI OCP work…
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
#75809
opened Mar 6, 2026 by
FilipB
Loading…
Enable review_acts_as_lgtm and lgtm_acts_as_approve for openshift/origin
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#75808
opened Mar 6, 2026 by
petr-muller
Loading…
add eval hub ui image for odh-dashboard
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#75807
opened Mar 6, 2026 by
pnaik1
Loading…
SSCSI-263: Make e2e-vault job as required
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#75806
opened Mar 6, 2026 by
chiragkyal
Loading…
branch 4.23 from 4.22
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#75805
opened Mar 6, 2026 by
jmguzik
Loading…
SSCSI-262: Fix sscsi cluster creation using manual credential
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#75804
opened Mar 6, 2026 by
chiragkyal
Loading…
ARO-HCP Extract aro-hcp-tests from aro-hcp-e2e-tools
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#75802
opened Mar 6, 2026 by
patriksuba
•
Draft
Unify ClusterAutoscaler configs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
lgtm
Indicates that a PR is ready to be merged.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#75800
opened Mar 6, 2026 by
liangxia
Loading…
Istio 1.28: change builder image to maistra-builder:3.3
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#75799
opened Mar 6, 2026 by
jewertow
Loading…
[WIP] Initial backup/restore setup for AWS
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
#75798
opened Mar 6, 2026 by
mgencur
Loading…
RHDH Decommission 1.7 E2E Test Jobs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#75796
opened Mar 6, 2026 by
zdrapela
Loading…
[WIP] Dual stream RHCOS 10.X Tech Prev Job for IBM Z
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
#75790
opened Mar 6, 2026 by
ibm-adarsh
•
Draft
debug aws hcp
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
run post e2e-analysis tests only when install succeed
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#75787
opened Mar 6, 2026 by
jianlinliu
Loading…
winc: bump master image ref for 4.22
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#75786
opened Mar 6, 2026 by
jrvaldes
Loading…
HYPERFLEET-695 - ci: configure Slack notifications for HyperFleet E2E periodic jobs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#75785
opened Mar 6, 2026 by
tzhou5
Loading…
Increase unit test memory limits
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
lgtm
Indicates that a PR is ready to be merged.
#75782
opened Mar 6, 2026 by
sunzhaohua2
Loading…
Previous Next
ProTip!
Find all pull requests that aren't related to any open issues with -linked:issue.