Skip to content

Pull requests: openshift/release

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Add CI presubmit config for cluster-health-analyzer release-1.1 approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#75817 opened Mar 6, 2026 by DavidRajnoha Loading…
WIP OCPBUGS-77895: Increase memory and VCPU for agent tests approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#75816 opened Mar 6, 2026 by bfournie Loading…
NO-JIRA: feat(tnf): add resource-agents steps under baremetalds/two-node/fencing jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#75815 opened Mar 6, 2026 by jaypoulz Loading…
Add hypershift-jira-solve-ci[bot] as trusted app for openshift/hypershift approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#75814 opened Mar 6, 2026 by bryan-cox Loading…
OCPBUGS-45921: Use HighlyAvailable infra policy for HyperShift serial conformance tests jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#75813 opened Mar 6, 2026 by alebedev87 Loading…
debug build-farm job failure approved Indicates a PR has been approved by an approver from all required OWNERS files.
#75811 opened Mar 6, 2026 by mcornea Loading…
Various improvements to Claude payload step approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged tide/merge-method-squash Denotes a PR that should be squashed by tide when it merges.
#75810 opened Mar 6, 2026 by stbenjam Loading…
Switch openshift-service-mesh configs from hypershift to IPI OCP work… approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#75809 opened Mar 6, 2026 by FilipB Loading…
Enable review_acts_as_lgtm and lgtm_acts_as_approve for openshift/origin approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#75808 opened Mar 6, 2026 by petr-muller Loading…
add eval hub ui image for odh-dashboard approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#75807 opened Mar 6, 2026 by pnaik1 Loading…
SSCSI-263: Make e2e-vault job as required approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#75806 opened Mar 6, 2026 by chiragkyal Loading…
branch 4.23 from 4.22 approved Indicates a PR has been approved by an approver from all required OWNERS files.
#75805 opened Mar 6, 2026 by jmguzik Loading…
SSCSI-262: Fix sscsi cluster creation using manual credential approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#75804 opened Mar 6, 2026 by chiragkyal Loading…
ARO-HCP Extract aro-hcp-tests from aro-hcp-e2e-tools do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#75802 opened Mar 6, 2026 by patriksuba Draft
Unify ClusterAutoscaler configs approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#75800 opened Mar 6, 2026 by liangxia Loading…
Istio 1.28: change builder image to maistra-builder:3.3 ok-to-test Indicates a non-member PR verified by an org member that is safe to test.
#75799 opened Mar 6, 2026 by jewertow Loading…
[WIP] Initial backup/restore setup for AWS do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#75798 opened Mar 6, 2026 by mgencur Loading…
RHDH Decommission 1.7 E2E Test Jobs approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#75796 opened Mar 6, 2026 by zdrapela Loading…
add stable job use oc-mirror
#75793 opened Mar 6, 2026 by MayXuQQ Loading…
[WIP] Dual stream RHCOS 10.X Tech Prev Job for IBM Z do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#75790 opened Mar 6, 2026 by ibm-adarsh Draft
debug aws hcp do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#75789 opened Mar 6, 2026 by gaol Draft
run post e2e-analysis tests only when install succeed approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#75787 opened Mar 6, 2026 by jianlinliu Loading…
winc: bump master image ref for 4.22 approved Indicates a PR has been approved by an approver from all required OWNERS files.
#75786 opened Mar 6, 2026 by jrvaldes Loading…
HYPERFLEET-695 - ci: configure Slack notifications for HyperFleet E2E periodic jobs approved Indicates a PR has been approved by an approver from all required OWNERS files. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#75785 opened Mar 6, 2026 by tzhou5 Loading…
Increase unit test memory limits approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged.
#75782 opened Mar 6, 2026 by sunzhaohua2 Loading…
ProTip! Find all pull requests that aren't related to any open issues with -linked:issue.