Skip to content

cfg: Rename HCP Slack channels#75824

Merged
openshift-merge-bot[bot] merged 2 commits intoopenshift:mainfrom
raelga:cfg/rename-slack-channels
Mar 6, 2026
Merged

cfg: Rename HCP Slack channels#75824
openshift-merge-bot[bot] merged 2 commits intoopenshift:mainfrom
raelga:cfg/rename-slack-channels

Conversation

@raelga
Copy link
Contributor

@raelga raelga commented Mar 6, 2026

This pull request updates the Slack notification channels for several periodic jobs in the Azure-ARO-HCP-main-periodics.yaml configuration file. The changes ensure that job failure and error notifications are sent to the correct Slack channels, aligning with the current team organization.

Slack channel updates for periodic job notifications:

  • Development and tooling jobs now report to #aro-hcp-failures-dev instead of the misc channel.
  • Integration jobs now report to #aro-hcp-failures-int instead of the previous int channel. [1] [2]
  • Production jobs now report to #aro-hcp-failures-prod instead of the previous prod channel. [1] [2]
  • Staging jobs now report to #aro-hcp-failures-stg instead of the previous stg channel. [1] [2]

@raelga raelga force-pushed the cfg/rename-slack-channels branch 2 times, most recently from 180c1ec to 79991a4 Compare March 6, 2026 17:09
@openshift-ci openshift-ci bot requested review from janboll and roivaz March 6, 2026 17:10
@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Mar 6, 2026
@openshift-ci-robot openshift-ci-robot added the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Mar 6, 2026
@raelga raelga force-pushed the cfg/rename-slack-channels branch from 79991a4 to a4c5ebe Compare March 6, 2026 17:14
raelga added 2 commits March 6, 2026 18:16
Signed-off-by: Rael Garcia <rael@redhat.com>
Signed-off-by: Rael Garcia <rael@redhat.com>
@raelga raelga force-pushed the cfg/rename-slack-channels branch from a4c5ebe to 90d4097 Compare March 6, 2026 17:17
@openshift-ci-robot
Copy link
Contributor

[REHEARSALNOTIFIER]
@raelga: no rehearsable tests are affected by this change

Note: If this PR includes changes to step registry files (ci-operator/step-registry/) and you expected jobs to be found, try rebasing your PR onto the base branch. This helps pj-rehearse accurately detect changes when the base branch has moved forward.

Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

@raelga
Copy link
Contributor Author

raelga commented Mar 6, 2026

/pj-rehearse periodic-ci-Azure-ARO-HCP-main-periodic-delete-expired-prod-resource-groups

@openshift-ci-robot
Copy link
Contributor

@raelga: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot
Copy link
Contributor

@raelga: job(s): periodic-ci-Azure-ARO-HCP-main-periodic-delete-expired-prod-resource-groups either don't exist or were not found to be affected, and cannot be rehearsed

@mmazur
Copy link
Member

mmazur commented Mar 6, 2026

/lgtm

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Mar 6, 2026
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Mar 6, 2026

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: mmazur, raelga

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-merge-bot openshift-merge-bot bot merged commit 7502c1a into openshift:main Mar 6, 2026
15 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants