-
Notifications
You must be signed in to change notification settings - Fork 35
Pull requests: openshift/dpu-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
bump google.golang.org/grpc to v1.79.3 to fix CVE-2026-33186 [release-4.20]
#646
opened Apr 8, 2026 by
zhiqiangf
Loading…
bump google.golang.org/grpc to v1.79.3 to fix CVE-2026-33186 [release-4.21]
#645
opened Apr 8, 2026 by
zhiqiangf
Loading…
OCPBUGS-75754: Update Go version to 1.24.12 to fix CVE-2025-61726
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
backport-risk-assessed
Indicates a PR to a release branch has been evaluated and considered safe to accept.
jira/severity-important
Referenced Jira bug's severity is important for the branch this PR is targeting.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
verified
Signifies that the PR passed pre-merge verification criteria
#640
opened Mar 27, 2026 by
zhiqiangf
Loading…
Feat: Add DpuNetwork CR, Per-network device pools and Accelerated NF support
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#636
opened Mar 3, 2026 by
alkama-hasan
Contributor
Loading…
Feat: Support upstream e2e deployment
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
needs-ok-to-test
Indicates a PR that requires an org member to verify it is safe to test.
[Ah/seq-diagram] Added Sequence Diagram For DpuNetworkCR with Disruptive Option
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#628
opened Jan 12, 2026 by
alkama-hasan
Contributor
Loading…
SynaXG plugin dev scheme review
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#626
opened Jan 9, 2026 by
einsteinXue
•
Draft
OCPBUGS-69846: Updating dpu-intel-ipu-vsp-container image to be consistent with ART for 4.22
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
verified
Signifies that the PR passed pre-merge verification criteria
#621
opened Dec 18, 2025 by
openshift-bot
Loading…
OCPBUGS-69843: Updating dpu-intel-ipu-p4sdk-container image to be consistent with ART for 4.22
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
verified
Signifies that the PR passed pre-merge verification criteria
#620
opened Dec 18, 2025 by
openshift-bot
Loading…
OCPBUGS-69763: Updating dpu-cni-container image to be consistent with ART for 4.22
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
verified
Signifies that the PR passed pre-merge verification criteria
#618
opened Dec 18, 2025 by
openshift-bot
Loading…
ProTip!
Type g i on any issue or pull request to go back to the issue listing page.