Skip to content

routine log: 2026-05-26#17

Draft
jim4226 wants to merge 1 commit into
mainfrom
claude/daily-2026-05-26-log
Draft

routine log: 2026-05-26#17
jim4226 wants to merge 1 commit into
mainfrom
claude/daily-2026-05-26-log

Conversation

@jim4226
Copy link
Copy Markdown
Owner

@jim4226 jim4226 commented May 26, 2026

Daily routine log for 2026-05-26. No code changes — state files only.

What's in here

Run summary

Status Count
opened-PR 2
deferred 2 (1 new + 1 reconsidered-still-deferred)
out-of-scope 0 new
sources unreachable 1 (platform.claude.com/docs/en — SPA loading state; subpages reachable)

PRs opened:

Deferred:

  • Managed Agents dreaming preview (platform.claude.com/docs/en/managed-agents/overview) — maps to ROADMAP P1.1; awaiting operator access confirmation via claude.com/form/claude-managed-agents
  • Stainless acquisition — reconsidered again, still no stable post-acquisition MCP generation API surface

Index note: brain/routines/index.md on main is stale because log PRs #9, #11, and #14 are still open drafts. This PR backfills 8 confirmed prior-run URL rows. Operator should merge log PRs in order (#9#11#14 → this PR) to keep the index current.


Generated by Claude Code

Two PRs opened:
- #15 external-content-layer: ExternalContentScanner (Layer 3 of
  three-layer defense) from "How we contain Claude across products"
  (Anthropic Engineering, 2026-05-25) — Theme 3+6
- #16 domain-system-prompt: system_prompt()/allowed_tools() hooks in
  Domain ABC, aligning with Agent SDK AgentDefinition pattern — Theme 1+6

Deferred: Managed Agents dreaming preview (P1.1 gate: operator access
confirmation needed). Stainless acquisition still deferred.

Backfills 8 prior-run URL rows from unmerged log PRs #9/#11/#14.
This was referenced May 28, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants