-
Notifications
You must be signed in to change notification settings - Fork 0
348 documentation #354
New issue
Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.
Already on GitHub? Sign in to your account
348 documentation #354
Conversation
Feeding summarizer changes into the documentation branch
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
Pull request overview
This PR improves the documentation for the MMIF summarizer and CLI scripts, addressing issue #348 about CLI script documentation organization and formatting.
Changes:
- Moved high-level summarizer documentation from module docstrings to dedicated documentation files
- Added proper Sphinx/reStructuredText formatting to docstrings (using
:var:,:param:,:meta private:directives) - Created new documentation pages for the summarizer with usage examples
- Updated module index to include the summarizer package documentation
Reviewed changes
Copilot reviewed 13 out of 14 changed files in this pull request and generated 2 comments.
Show a summary per file
| File | Description |
|---|---|
| mmif/utils/summarizer/init.py | Moved module-level documentation to package docstring, removed outdated code comments |
| mmif/utils/summarizer/utils.py | Updated module docstring formatting |
| mmif/utils/summarizer/summary.py | Converted docstring comments to proper Sphinx format with :var: directives |
| mmif/utils/summarizer/graph.py | Added comprehensive documentation with proper Sphinx formatting, type hints, and :meta private: directives |
| mmif/utils/cli/summarize.py | Added docstrings for functions with type hints |
| mmif/utils/cli/describe.py | Minor formatting improvements to docstring |
| documentation/summarizer.rst | New documentation file for the summarizer with usage examples |
| documentation/modules.rst | Added summarizer package to module index |
| documentation/index.rst | Added summarizer to documentation table of contents |
| documentation/cli.rst | Minor wording improvement |
| documentation/autodoc/mmif.utils.summarizer.rst | New autodoc configuration for summarizer package |
| documentation/autodoc/mmif.utils.cli.rst | Added summarize module to CLI autodoc |
| documentation-notes.md | Added note about source links in documentation |
| .gitignore | Changed file extension for whatsnew from .rst to .md |
💡 Add Copilot custom instructions for smarter, more guided reviews. Learn how to get started.
| - The time unit is assumed to be milliseconds. | ||
|
|
||
|
|
||
| The summarizer is accessable via the ``mmif`` command line script. To run the |
Copilot
AI
Jan 29, 2026
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
Spelling error: "accessable" should be "accessible".
| The summarizer is accessable via the ``mmif`` command line script. To run the | |
| The summarizer is accessible via the ``mmif`` command line script. To run the |
|
|
||
| .. code-block:: bash | ||
|
|
||
| mmif summarize -i INFILE -o OUTFILE |
Copilot
AI
Jan 29, 2026
There was a problem hiding this comment.
Choose a reason for hiding this comment
The reason will be displayed to describe this comment to others. Learn more.
Inconsistent indentation: The code block indentation uses a tab character here, but other code blocks in the documentation (cli.rst, introduction.rst, plugins.rst) use spaces. For consistency, this should use spaces instead of a tab.
|
closing without merge, I found the 348 branch already previously PREMATURELY merged into the develop branch WITHOUT a proper PR, so I'm reverting it to get a sole working branch first. |
|
Ah, I see this is probably my old habit of local merging popping up. As for the premature bit, this begs the question of what premature is in the context of a merge into develop. I think the more useful approach is to get to a good handle on when exactly we should request reviews on PRs. Another thought is that before merging into develop we could do a merge from develop, but I am not that enamored with having those back and forth merges all over the place. |
addresses #348 and other various minor documentation issues