Skip to content

clamsproject/app-pyscenedetect-wrapper

Repository files navigation

PySceneDetect Wrapper

Description

This CLAMS app wraps PySceneDetect and performs shot boundary detection on input videos.

A shot boundary is a place where one camera shot ends and another begins. The app detects shot boundaries and outputs a list of timestamps where the shot boundaries occur.

User instruction

General user instruction for CLAMS apps is available at CLAMS Apps documentation.

System requirments

Configurable runtime parameter

Although all CLAMS apps are supposed to run as stateless HTTP servers, some apps can configured at request time using URL query strings. For runtime parameter supported by this app, please visit CLAMS App Directory and look for the app name and version.

About

This app is a wrapper for the pyscenedetect library

Resources

License

Stars

Watchers

Forks

Packages

 
 
 

Contributors