Implement rollout halting and degraded node surfacing#96
Open
jlebon wants to merge 4 commits into
Open
DCO-2 / DCO
succeeded
Jul 8, 2026 in 0s
Check passed!
All commits are signed off, the check passed.
Summary
| Sha | Message | Pass or fail reason | |
|---|---|---|---|
| 🟢 | fdf2123 | controller: set pool Degraded/NodeDegraded when no... | Valid sign-off found |
| 🟢 | 5029fc5 | api: add PoolRolloutHalted degraded reason | Valid sign-off found |
| 🟢 | ddd0c0c | controller: halt rollout when 2+ nodes in reboot s... | Valid sign-off found |
| 🟢 | 94e484c | test: use status patch in setNodeReady to avoid co... | Valid sign-off found |
Loading