133 changes: 131 additions & 2 deletions MILESTONES.md
Original file line number Diff line number Diff line change
Expand Up @@ -496,20 +496,109 @@ before any design or implementation:
- Remaining tail items are not automatic continuation work. They require replanning before
implementation because they carry product-surface, evidence, policy, or package-boundary
decisions outside the Phases 6-9 spine.
- Post-spine decisions (2026-07-04): the owner's sitting after the closeout checkpoint above.
These append to M7; they do not rewrite the closeout text.
1. **D-EXIT (M7 exit evidence) — Option A.** A committed, redacted, citable real-run evidence
record ("EVRUN") is mandatory for M7 exit either way. The owner accepts that its agent leg
may be a scripted injected session with an explicit Limitations section
("EVRUN-partial"), with the Codex-driven leg ("EVRUN-full") recorded as a **named debt**
retired by the post-M7 Codex-transport track (N1). M7's `State` above stays `current` and
flips to `done` only when the EVRUN-partial record is merged — per this file's own rule
that a milestone is done only when exit criteria are evidenced. Concrete Codex transport
evidence stays a post-M7 validation adjunct gating any v0 contract freeze, not org-level
exit. Lifecycle-edge split: no codex-plugin-cc-style lifecycle edges (broker, interrupt,
cleanup, Windows process-tree) gate M7 exit; all of them gate the transport ADR and,
through it, the freeze.
2. **Packaging (N2) — internal SDK boundary now, no publishing.** Rationale: extensibility and
single-responsibility; the SDK's first-party consumers are jig's CLI and a future MCP
surface. Packages stay `private: true`; the posture can flip to public later, and no
stability promise is created now. The third-party (out-of-repo, installable)
provider-ecosystem question explicitly **remains open** as a deferred product question —
the packaging design must not silently assume it either way. Consequence: jig's
packaging/SDK-boundary design cycle (N3) is authorized to start once this decision is
recorded in jig's product docs.
3. **TUI/dashboard — extension-point-only** (per jig guarantee CFG-7). No first-party TUI
cycle; reopen only on recorded operator pain. Third-party surfaces are enabled through the
observability-records contract plus the internal SDK boundary (decision 2).
4. **Smoke target (operational) — hybrid.** A local bare git remote serves repeatable
push-path smoke tests (no credentials); a dedicated private sandbox repo
(`jig-smoke-target`) with a repo-scoped fine-grained PAT (env-only, never in records)
serves the full landing evidence (push + PR + merge + block-surfacing); an independent
secret-scan of any evidence record is required before it is committed.
5. **Merge policy for the wave.** The owner authorized autonomous squash-merge for wave-1 PRs
once review threads are resolved and `pnpm check` is green, except this sequencing PR
itself (`.github`, "docs: record post-M7 sequencing decisions and authorize wave 1"),
which is human-reviewed and human-merged.
6. **Wave-1 authorization.** The following may start once this PR records the decisions above:
- jig's absorption-ledger absorbed-vs-open update;
- jig's Codex-transport evidence-capture plan, plus a dated/hashed `evidence/` convention;
- jig's product amendment recording decision 2 (packaging/SDK boundary);
- a design-flow item for self-report-only/mock-adequacy conformance vocabulary;
- the EVRUN-partial evidence task, once the smoke target (decision 4) exists;
- M8 below, as a **proposal for owner ratification** in this PR's review — it is not
self-authorizing.

M6 (Learning Loop Seed) stays `proposed` and is not part of this wave-1 list; pull timing
remains an open org choice.

7. **Repo-plan open-question disposition** — `jig/docs/delivery/m7-real-providers/repo-plan-m7.md`
"Open questions to send back to the org roadmap" #1-#3, each verified against the jig ADRs
at the time of this sitting:
- **#1 — sync `describe()` vs async proof: settled by ADR 0022.**
[`jig/docs/design/decisions/0022-phase-6-real-driver-integration.md`](https://github.com/agentic-workflow-kit/jig/blob/main/docs/design/decisions/0022-phase-6-real-driver-integration.md),
Decision 3, "`describe()` stays synchronous — prove-then-describe resolves the
sync/async tension": the confinement proof runs async at compose time, outside
`describe()`, in the host driver's factory; `describe()` stays a pure getter over an
already-computed attestation. No P5-pinned seam surface flexes. Confirm this holds at
the transport-ADR session.
- **#2 — `action`-union / provenance record impact: settled by ADR 0023 and ADR 0024.**
[`jig/docs/design/decisions/0023-phase-7-real-forge-landing.md`](https://github.com/agentic-workflow-kit/jig/blob/main/docs/design/decisions/0023-phase-7-real-forge-landing.md),
Decision 2, repairs `LandingRequest.action` from the single mis-encoded literal
`'push|open-pr|merge'` to the real union `'push' | 'open-pr' | 'merge'` — a local
port-type fix that freezes nothing; the dry-run modeled-landing record keeps recording
the literal token verbatim, so the byte-identity goldens are untouched.
[`jig/docs/design/decisions/0024-phase-8-real-work-source.md`](https://github.com/agentic-workflow-kit/jig/blob/main/docs/design/decisions/0024-phase-8-real-work-source.md),
Decision 3, widens `CandidateWorkItem.provenance` from the single literal
`'jig-validated'` to an origin-bearing shape (source system + candidate identifier),
legible in the run record as an additive field alongside `run.drivers.workSource` — also
a local fix, no records-contract freeze required. Both ADRs confirm no
observability-records v0 field change was needed.
- **#3 — tamper-evidence contract field: resolved for now by ADR 0025.**
[`jig/docs/design/decisions/0025-phase-9-records-integrity.md`](https://github.com/agentic-workflow-kit/jig/blob/main/docs/design/decisions/0025-phase-9-records-integrity.md),
Decision 1 plus Contract Impact Gate Q5: tamper-evidence is computed over existing
durable evidence but materialized on a separate, non-golden integrity sidecar
(`runs/<id>/integrity.json`, name design-owned) with an environment-keyed HMAC; no
digest/HMAC field is added to the observability-records v0 contract. The ADR states
this explicitly answers open question 3 and that the freeze posture is re-examined at
the v0-freeze checkpoint (T14), not settled here.
Comment thread
aryeko marked this conversation as resolved.
8. **Contract-owner role named.** The contract owner for the two org seams jig owns
(execution-plan, observability-records) — the role that receives routed seam-shape
questions (for example, the transport session-observability question and any
port-surface flex) and that alone executes any v0 contract freeze at the T14
checkpoint — is jig's design authority: the org/product owner deciding through jig's
ADR flow (`docs/design/decisions/`), per M1's seam ownership. Delivery tracks and
sub-agents do not decide seam shapes (the repo-plan "must not decide" boundary).
- Repo planning handoff:
- `jig` derives its repo plan directly from this milestone, decomposing the outcome into its
own phases and stories. Org milestones carry no story list; that decomposition lives in
Jig's delivery track.
- The real run records M7 emits strengthen M6 seeding, but M6 does not block on M7 — M6's
entry is already satisfiable by M1 examples or an M5 record.
- Concrete Codex transport evidence or an ADR is a post-M7 validation adjunct unless the
org explicitly decides that shipped transport evidence is required for M7 exit.
- A first-party TUI or dashboard needs product-surface design before implementation.
org explicitly decides that shipped transport evidence is required for M7 exit. Decided
2026-07-04 (Post-spine decision 1): it remains a post-M7 adjunct gating any v0 freeze,
not org-level exit; M7 exit evidence is the committed EVRUN-partial record.
- A first-party TUI or dashboard is extension-point-only (Post-spine decision 3,
2026-07-04): no first-party TUI cycle; reopen only on recorded operator pain.
Third-party surfaces build on the observability-records contract and the internal SDK
boundary.
- A policy analyzer should wait for enough real run-history data to avoid designing against
synthetic or one-off examples.
- v0 contract freeze or package extraction is gated by Phase 9 records-integrity evidence
from Jig PR #39 plus package-boundary and product decisions; if the org requires
concrete transport evidence for M7 exit, that evidence should also precede any freeze.
The package-boundary/product decision is recorded (Post-spine decision 2); the
transport-evidence conditional is resolved by decision 1.
- Risks / kill assumptions:
- Fails if a real driver can escalate its substrate — argv, credentials, or egress — past
what the attestation authorized.
Expand All @@ -522,6 +611,46 @@ before any design or implementation:
- A real run record — with attestation, tamper-evidence, and redacted secrets — can be cited
by Learning-loop design.

### M8: Planning-discipline uplift

- State: proposed — recorded here as a proposal for owner ratification in the PR that adds
this entry; it does not self-authorize on merge of that PR alone.
- Outcome: Enable the Planning layer (and the layers that feed it) to reuse the durable
planning-discipline ideas the prev-gen authoring standard proved out, de-productized from
that legacy corpus rather than ported wholesale, so future planning cycles do not
re-discover the same lessons from scratch.
- Why now: Raised at the 2026-07-04 post-M7 sequencing sitting alongside the M7 exit,
packaging, TUI, smoke-target, and merge-policy decisions, as the owner's forward-looking
planning-quality item for the wave after the M7 spine closed.
- Primary owner: `design-to-plan`
- Participating repos: `design-to-plan`, `technical-design`, `jig`, `.github`
- Owned seam or artifact: Not yet pinned. This entry proposes the milestone; the seam or
artifact it owns (if any) is decided when the milestone is planned, not here.
- Entry criteria:
- The owner ratifies this milestone (this entry is a proposal pending that ratification).
- M7's post-spine decisions above are recorded (this PR).
- Exit criteria:
- Not yet defined. Per this file's Planning Rules, exit criteria are set when the milestone
is planned in detail, not invented ahead of that work; this proposal intentionally leaves
them open rather than guessing at scope the owner has not yet specified.
- Artifacts: Not yet defined; derived when the milestone is planned.
- Repo planning handoff:
- `design-to-plan` derives its own repo plan from M8 once ratified and planned.
- `technical-design` and `jig` participate where the de-productized ideas touch their
layers, but do not decide M8's scope unilaterally.
- Carve-out: jig's `PlanValidator` plan-ingest preflights (the Phase 8 structural intake
chokepoint and related plan-validation feedback) may proceed jig-locally under M4's
existing plan-validation-feedback ownership without waiting for M8. M8 does not gate
work M4 already owns.
- Risks / kill assumptions:
- Fails if it re-imports the legacy authoring standard wholesale instead of de-productizing
only the durable ideas.
- Fails if it duplicates or contests M4's existing plan-validation-feedback ownership rather
than sitting alongside it.
- Fails if "planning discipline" expands into a general planning-layer rewrite instead of a
bounded uplift.
- Evidence when landed: Not yet defined; recorded when the milestone is planned and delivered.

---

## Deferred From This Sequence
Expand Down
8 changes: 5 additions & 3 deletions ROADMAP.md
Original file line number Diff line number Diff line change
Expand Up @@ -99,9 +99,11 @@ parallel. The current sequence is tracked in [`MILESTONES.md`](./MILESTONES.md).
skeleton through the M7 real-provider track. Jig PR #39 merged the Phase 9
records-integrity closeout at `3b3d224`, completing the M7 repo-track spine for real
agent/host, Forge, work-source, and records-integrity behavior behind the same contracts.
Tail work now needs replanning before implementation: concrete Codex transport evidence,
TUI/dashboard product-surface design, policy-analyzer timing based on real run history,
and any contract freeze or package extraction decision.
Per the 2026-07-04 post-M7 sequencing decisions (`MILESTONES.md`), the tail is now
replanned rather than open-ended: a Codex-transport evidence-capture track and an internal
SDK packaging boundary (no publishing) are authorized to start; a first-party TUI/dashboard
stays an extension-point-only non-goal; and any v0 contract freeze still waits on M7 exit
Comment thread
aryeko marked this conversation as resolved.
evidence plus the packaging and transport decisions.
- **References (curated):**
- Product (own, drafted): `jig/docs/product/jig.md`, `guarantees.md`, `use-cases.md`,
`concepts.md`.
Expand Down