Dummy PR #191
Open
Dummy PR #191
exploit-iq-pac / Pipelines as Code CI / vulnerability-analysis-on-pr
cancelled
Jan 26, 2026 in 8s
Cancelled
Pipelines as Code CI/vulnerability-analysis-on-pr has been cancelled.
Details
- Namespace: exploit-iq-tests
- PipelineRun: vulnerability-analysis-on-pr-zb68w
Task Statuses:
| Status | Duration | Name |
|---|---|---|
| 🔴 Failed | 7 seconds |
Failure snippet:
task fetch-repository has the status "TaskRunCancelled":TaskRun "vulnerability-analysis-on-pr-zb68w-fetch-repository" was cancelled. TaskRun cancelled as the PipelineRun it belongs to has been cancelled.
Loading