Project Implementation
LUXIANZE edited this page Jun 29, 2020
·
5 revisions
The project has done basic setup and is ready for development, the development schedule will be uploaded soon.
Task distributed as:
| Class | PIC |
|---|---|
| PointGenerator | Ka Chun |
| Point | Clement |
| Edge | Yaw |
| PointPairingThread | Lu |
| Board + StopTask | Sia |
The tasks are expected to be done by 28th MAY 2020.
Simple Unit Tests are carried out before merging, however certain flaws still were detected through static testing, the details:
- PointGenerator helper class that provides general functions that does not require instantiation was created by Ka Chun. Merged by Lu.
- Point Class was created by Clement, Reviewed by Lu. A few redundant methods are being discussed and agreed to be deleted.
- Edge Class was created by Yaw, no problem hence proceed to merge.
- PointPairingThread was created by Lu, renamed to PointPairingTask for better naming. Reviewed by Ka Chun and Yaw, carried out modifications accordingly before merging by Ka Chun.
- Board and StopTask, currently under construction by Sia.
Construction of Front-end
- Look for possible solutions online
- Implementation using a single React-component.
- Front-end development with dummy data.
- Back-end creating channels for different data.
- Front-end and Back-end integration.
- Include colours to identify threads.
Wrapping up the project
- Prepared executable jar for server instance, coded to be hosted on localhost port 8080.
- Prepared instructions of executing the project with both Front-end and Back-end launched.