Skip to content

refactor!: migrate from poetry to uv #96

refactor!: migrate from poetry to uv

refactor!: migrate from poetry to uv #96

Triggered via push February 5, 2026 22:12
Status Failure
Total duration 3m 32s
Artifacts

lint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

15 errors
build (3.12, ubuntu-latest)
Process completed with exit code 2.
build (3.11, ubuntu-latest)
The strategy configuration was canceled because "build._3_12_ubuntu-latest" failed
build (3.11, ubuntu-latest)
Process completed with exit code 2.
build (3.13, ubuntu-latest)
The strategy configuration was canceled because "build._3_12_ubuntu-latest" failed
build (3.13, ubuntu-latest)
The operation was canceled.
build (3.12, windows-latest)
The strategy configuration was canceled because "build._3_12_ubuntu-latest" failed
build (3.12, windows-latest)
The operation was canceled.
build (3.14, windows-latest)
The strategy configuration was canceled because "build._3_12_ubuntu-latest" failed
build (3.14, windows-latest)
The operation was canceled.
build (3.11, windows-latest)
The strategy configuration was canceled because "build._3_12_ubuntu-latest" failed
build (3.11, windows-latest)
The operation was canceled.
build (3.13, windows-latest)
The strategy configuration was canceled because "build._3_12_ubuntu-latest" failed
build (3.13, windows-latest)
The operation was canceled.
build (3.14, ubuntu-latest)
The strategy configuration was canceled because "build._3_12_ubuntu-latest" failed
build (3.14, ubuntu-latest)
The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.