build(deps-dev): bump lodash from 4.17.21 to 4.17.23 #48
ci.yaml
on: pull_request
build
19s
Push ${{ github.ref }}
0s
Matrix: pr
Annotations
5 errors
|
PR (Node v24, OS ubuntu-latest)
Process completed with exit code 1.
|
|
PR (Node v24, OS windows-latest)
The strategy configuration was canceled because "pr.ubuntu-latest_24" failed
|
|
PR (Node v24, OS windows-latest)
The operation was canceled.
|
|
PR (Node v8, OS windows-latest)
The strategy configuration was canceled because "pr.ubuntu-latest_24" failed
|
|
PR (Node v8, OS windows-latest)
The operation was canceled.
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
build
Expired
|
54.9 KB |
sha256:9edcafc693d69321099f7b222ce0386fad84869bf221cb3f97e5060326a4bbb2
|
|