You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Complete the implementation of advanced Wasmtime features including debugging, profiling, diagnostics, and advanced configuration options. This task focuses on finalizing the comprehensive feature set that makes Wasmtime4j suitable for production use, development, and performance analysis.
Scope
Complete debugging and profiling API implementations
Finalize comprehensive error handling and diagnostics
Add missing advanced configuration options and tuning parameters
Implement performance monitoring and analysis capabilities
Add comprehensive logging and observability features
Key Deliverables
1. Debugging and Development Tools
Complete DWARF debugging information support
Implement breakpoint and stepping functionality
Add stack trace and call frame inspection
Implement variable inspection and memory debugging
Add support for debug symbol loading and resolution
2. Profiling and Performance Analysis
Complete CPU profiling and sampling support
Implement memory allocation tracking and analysis
Add execution time profiling and hot spot detection
Implement compilation time analysis and optimization tracking
Add support for flame graph generation and analysis
3. Comprehensive Error Handling and Diagnostics
Complete detailed error reporting with source locations
Implement comprehensive trap analysis and reporting
Add support for custom error handlers and recovery
Implement detailed validation error reporting
Add runtime error context and stack unwinding
4. Advanced Configuration and Tuning
Complete all engine configuration options and tuning parameters
Task: Advanced Features Integration
Overview
Complete the implementation of advanced Wasmtime features including debugging, profiling, diagnostics, and advanced configuration options. This task focuses on finalizing the comprehensive feature set that makes Wasmtime4j suitable for production use, development, and performance analysis.
Scope
Key Deliverables
1. Debugging and Development Tools
2. Profiling and Performance Analysis
3. Comprehensive Error Handling and Diagnostics
4. Advanced Configuration and Tuning
5. Observability and Monitoring
Technical Requirements
Debugging Infrastructure
Profiling and Analysis
Error and Diagnostic Systems
Performance Optimization
Implementation Strategy
Phase 1: Debugging and Development (8-10 hours)
Phase 2: Profiling and Performance (6-8 hours)
Phase 3: Configuration and Observability (6-8 hours)
Quality Assurance
Testing Requirements
Performance Validation
Compatibility Validation
Dependencies
Effort Estimation
Medium: 20-26 hours
Acceptance Criteria
Advanced Feature Considerations
Debugging Integration
Profiling Accuracy
Error Recovery Strategies
Configuration Flexibility
Integration with Ecosystem
Development Tool Support
Monitoring and Observability
Performance Analysis