Problem statement
Phase 6 deliverable 3 needs a dedicated implementation issue to ensure scope clarity and testable acceptance criteria.
Intended invariant
Provide explicit temporary compatibility shim for legacy call sites with sunset criteria.
Scope boundaries
- Implements only this Phase 6 deliverable
- Coordinates with sibling Phase 6 issues through the epic
- No out-of-scope feature expansion
Deliverable checklist
Validation plan
Define and execute deterministic tests for this deliverable; attach CI/verification evidence before closing.
Rollback/failure mode
If acceptance criteria cannot be met in this scope, split into follow-up issue(s) and update roadmap + epic links immediately.
Parent epic
#96
Roadmap reference
Roadmap reference: docs/plans/2026-06-19-001-ir-first-roadmap.md (Phase 6)
Migration impact
minor - expected impact for this deliverable (adjust if needed with explicit rationale).
Documentation impact
update-existing - evaluate guide/API/concepts/examples and update as required.
Sync status
Synced with roadmap: 2026-06-19
Problem statement
Phase 6 deliverable 3 needs a dedicated implementation issue to ensure scope clarity and testable acceptance criteria.
Intended invariant
Provide explicit temporary compatibility shim for legacy call sites with sunset criteria.
Scope boundaries
Deliverable checklist
Validation plan
Define and execute deterministic tests for this deliverable; attach CI/verification evidence before closing.
Rollback/failure mode
If acceptance criteria cannot be met in this scope, split into follow-up issue(s) and update roadmap + epic links immediately.
Parent epic
#96
Roadmap reference
Roadmap reference: docs/plans/2026-06-19-001-ir-first-roadmap.md (Phase 6)
Migration impact
minor - expected impact for this deliverable (adjust if needed with explicit rationale).
Documentation impact
update-existing - evaluate guide/API/concepts/examples and update as required.
Sync status
Synced with roadmap: 2026-06-19