Skip to content

[IR-P5][WS4] Phase 5 Codec and hydration ABI unification (epic) #92

@0x054

Description

@0x054

Problem statement

Phase 5 needs a controlling epic to coordinate deliverables, acceptance criteria, and traceability for Codec and hydration ABI unification.

Intended invariant

Centralize bind/fetch type behavior and formalize the hydration ABI.

Scope boundaries

  • Coordinates Phase 5 roadmap scope only
  • Tracks delivery issues and phase exit gate evidence
  • Defers unrelated feature expansion outside IR roadmap scope

Deliverable checklist

  • Sub-issues for all phase deliverables are opened and linked
  • Phase deliverables are implemented and verified
  • Exit gate evidence is linked in roadmap and issues
  • Migration and docs impact fields are kept synchronized

Validation plan

Phase 5 closes only when linked sub-issues are complete and roadmap phase exit gates are satisfied with evidence.

Rollback/failure mode

If scope expands or deliverables split, create follow-up issues and update roadmap + issue links in the same work session.

Roadmap reference

Roadmap reference: docs/plans/2026-06-19-001-ir-first-roadmap.md (Phase 5)

Migration impact

minor - phase-level impact estimate; refine on each sub-issue.

Documentation impact

update-existing - phase requires synchronized docs updates with implementation.

Sync status

Synced with roadmap: 2026-06-19

Metadata

Metadata

Assignees

Labels

No labels
No labels

Type

No type
No fields configured for issues without a type.

Projects

No projects

Relationships

None yet

Development

No branches or pull requests

Issue actions