Problem statement
Phase 2 needs a controlling epic to coordinate deliverables, acceptance criteria, and traceability for Shadow runtime dual-run.
Intended invariant
Run IR-derived runtime planning in shadow mode and compare semantics against current runtime path.
Scope boundaries
- Coordinates Phase 2 roadmap scope only
- Tracks delivery issues and phase exit gate evidence
- Defers unrelated feature expansion outside IR roadmap scope
Deliverable checklist
Validation plan
Phase 2 closes only when linked sub-issues are complete and roadmap phase exit gates are satisfied with evidence.
Rollback/failure mode
If scope expands or deliverables split, create follow-up issues and update roadmap + issue links in the same work session.
Roadmap reference
Roadmap reference: docs/plans/2026-06-19-001-ir-first-roadmap.md (Phase 2)
Migration impact
none - phase-level impact estimate; refine on each sub-issue.
Documentation impact
update-existing - phase requires synchronized docs updates with implementation.
Sync status
Synced with roadmap: 2026-06-19
Problem statement
Phase 2 needs a controlling epic to coordinate deliverables, acceptance criteria, and traceability for
Shadow runtime dual-run.Intended invariant
Run IR-derived runtime planning in shadow mode and compare semantics against current runtime path.
Scope boundaries
Deliverable checklist
Validation plan
Phase 2 closes only when linked sub-issues are complete and roadmap phase exit gates are satisfied with evidence.
Rollback/failure mode
If scope expands or deliverables split, create follow-up issues and update roadmap + issue links in the same work session.
Roadmap reference
Roadmap reference: docs/plans/2026-06-19-001-ir-first-roadmap.md (Phase 2)
Migration impact
none - phase-level impact estimate; refine on each sub-issue.
Documentation impact
update-existing - phase requires synchronized docs updates with implementation.
Sync status
Synced with roadmap: 2026-06-19