Problem statement
Phase 1 needs a controlling epic to coordinate deliverables, acceptance criteria, and traceability for Build IR core and compiler.
Intended invariant
Introduce a Rust-owned IR crate and compile Python model metadata into deterministic IR artifacts.
Scope boundaries
- Coordinates Phase 1 roadmap scope only
- Tracks delivery issues and phase exit gate evidence
- Defers unrelated feature expansion outside IR roadmap scope
Deliverable checklist
Validation plan
Phase 1 closes only when linked sub-issues are complete and roadmap phase exit gates are satisfied with evidence.
Rollback/failure mode
If scope expands or deliverables split, create follow-up issues and update roadmap + issue links in the same work session.
Roadmap reference
Roadmap reference: docs/plans/2026-06-19-001-ir-first-roadmap.md (Phase 1)
Migration impact
none - phase-level impact estimate; refine on each sub-issue.
Documentation impact
update-existing - phase requires synchronized docs updates with implementation.
Sync status
Synced with roadmap: 2026-06-19 (Phase 1 implementation evidence linked in roadmap and migration guide on working branch)
Problem statement
Phase 1 needs a controlling epic to coordinate deliverables, acceptance criteria, and traceability for
Build IR core and compiler.Intended invariant
Introduce a Rust-owned IR crate and compile Python model metadata into deterministic IR artifacts.
Scope boundaries
Deliverable checklist
SchemaIRserialization + model-set fingerprinting verified in CIValidation plan
Phase 1 closes only when linked sub-issues are complete and roadmap phase exit gates are satisfied with evidence.
Rollback/failure mode
If scope expands or deliverables split, create follow-up issues and update roadmap + issue links in the same work session.
Roadmap reference
Roadmap reference: docs/plans/2026-06-19-001-ir-first-roadmap.md (Phase 1)
Migration impact
none - phase-level impact estimate; refine on each sub-issue.
Documentation impact
update-existing - phase requires synchronized docs updates with implementation.
Sync status
Synced with roadmap: 2026-06-19 (Phase 1 implementation evidence linked in roadmap and migration guide on working branch)