Problem statement
Phase 7 needs a controlling epic to coordinate public IR-first release work while deprecated compatibility paths remain supported through the migration window.
Intended invariant
Ship the public IR-first upgrade release with deprecated methods still available and clearly warning about v0.13.0 removal.
Scope boundaries
- Coordinates Phase 7 roadmap scope only
- Tracks release-readiness, migration docs, and compatibility-window evidence
- Explicitly excludes deprecated-surface removal (Phase 8 /
v0.13.0)
Deliverable checklist
Validation plan
Phase 7 closes only when linked sub-issues are complete and roadmap phase exit gates are satisfied with evidence.
Rollback/failure mode
If sequencing/scope changes, update roadmap + linked issues in the same work session.
Roadmap reference
Roadmap reference: docs/plans/2026-06-19-001-ir-first-roadmap.md (Phase 7)
Migration impact
minor - public release with compatibility support; removal deferred to Phase 8 (v0.13.0).
Documentation impact
new-docs - release + migration documentation must ship with phase completion.
Sync status
Synced with roadmap: 2026-06-19
Problem statement
Phase 7 needs a controlling epic to coordinate public IR-first release work while deprecated compatibility paths remain supported through the migration window.
Intended invariant
Ship the public IR-first upgrade release with deprecated methods still available and clearly warning about
v0.13.0removal.Scope boundaries
v0.13.0)Deliverable checklist
Validation plan
Phase 7 closes only when linked sub-issues are complete and roadmap phase exit gates are satisfied with evidence.
Rollback/failure mode
If sequencing/scope changes, update roadmap + linked issues in the same work session.
Roadmap reference
Roadmap reference: docs/plans/2026-06-19-001-ir-first-roadmap.md (Phase 7)
Migration impact
minor - public release with compatibility support; removal deferred to Phase 8 (
v0.13.0).Documentation impact
new-docs - release + migration documentation must ship with phase completion.
Sync status
Synced with roadmap: 2026-06-19