Skip to content

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.0 #889

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.0

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.11.0 #889

Triggered via pull request March 14, 2025 18:11
Status Failure
Total duration 1m 16s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

build.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.10)
Process completed with exit code 1.
build (3.9)
Process completed with exit code 1.
build (3.12)
Process completed with exit code 1.
build (3.11)
The job was canceled because "_3_10" failed.
build (3.11)
The operation was canceled.
build (3.13)
The job was canceled because "_3_10" failed.
build (3.13)
The operation was canceled.