Skip to content

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.9.10 #876

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.9.10

chore(deps): update pre-commit hook astral-sh/ruff-pre-commit to v0.9.10 #876

Triggered via pull request March 7, 2025 16:00
Status Failure
Total duration 1m 21s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

build.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.10)
Process completed with exit code 1.
build (3.11)
The job was canceled because "_3_10" failed.
build (3.11)
Process completed with exit code 1.
build (3.12)
The job was canceled because "_3_10" failed.
build (3.12)
Process completed with exit code 1.
build (3.13)
The job was canceled because "_3_10" failed.
build (3.13)
Process completed with exit code 1.
build (3.9)
The job was canceled because "_3_10" failed.
build (3.9)
Process completed with exit code 1.