Skip to content

Add interop integration test harness for LND, CLN, and Eclair #3280

Add interop integration test harness for LND, CLN, and Eclair

Add interop integration test harness for LND, CLN, and Eclair #3280

Triggered via pull request April 27, 2026 08:29
Status Failure
Total duration 4m 32s
Artifacts

rust.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

17 errors
build (ubuntu-latest, stable)
Process completed with exit code 101.
build (windows-latest, stable)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (windows-latest, stable)
The operation was canceled.
build (windows-latest, beta)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (windows-latest, beta)
The operation was canceled.
build (windows-latest, 1.85.0)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (windows-latest, 1.85.0)
The operation was canceled.
build (ubuntu-latest, 1.85.0)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (ubuntu-latest, 1.85.0)
The operation was canceled.
build (ubuntu-latest, beta)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (ubuntu-latest, beta)
The operation was canceled.
build (macos-latest, stable)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (macos-latest, stable)
The operation was canceled.
build (macos-latest, beta)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (macos-latest, beta)
The operation was canceled.
build (macos-latest, 1.85.0)
The strategy configuration was canceled because "build.ubuntu-latest_stable" failed
build (macos-latest, 1.85.0)
The operation was canceled.