Skip to content

Merge pull request #748 from tnull/2026-01-fix-backwards-compat #2527

Merge pull request #748 from tnull/2026-01-fix-backwards-compat

Merge pull request #748 from tnull/2026-01-fix-backwards-compat #2527

Triggered via push January 9, 2026 08:56
Status Failure
Total duration 10m 59s
Artifacts

rust.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

11 errors
build (ubuntu-latest, beta)
Process completed with exit code 101.
build (ubuntu-latest, 1.85.0)
The strategy configuration was canceled because "build.ubuntu-latest_beta" failed
build (ubuntu-latest, 1.85.0)
The operation was canceled.
build (ubuntu-latest, stable)
The strategy configuration was canceled because "build.ubuntu-latest_beta" failed
build (ubuntu-latest, stable)
The operation was canceled.
build (macos-latest, beta)
The strategy configuration was canceled because "build.ubuntu-latest_beta" failed
build (macos-latest, beta)
The operation was canceled.
build (macos-latest, 1.85.0)
The strategy configuration was canceled because "build.ubuntu-latest_beta" failed
build (macos-latest, 1.85.0)
The operation was canceled.
build (macos-latest, stable)
The strategy configuration was canceled because "build.ubuntu-latest_beta" failed
build (macos-latest, stable)
The operation was canceled.