Skip to content

chore(main): release 1.3.0 (#50) #75

chore(main): release 1.3.0 (#50)

chore(main): release 1.3.0 (#50) #75

Triggered via push June 26, 2025 17:20
Status Failure
Total duration 2m 17s
Artifacts

ci.yml

on: push
Matrix: linux
Matrix: windows
Fit to window
Zoom out
Zoom in

Annotations

9 errors
linux (3.11)
Process completed with exit code 2.
linux (3.12)
The operation was canceled.
linux (3.12)
The strategy configuration was canceled because "linux._3_11" failed
linux (3.13)
The operation was canceled.
linux (3.13)
The strategy configuration was canceled because "linux._3_11" failed
linux (3.9)
The operation was canceled.
linux (3.9)
The strategy configuration was canceled because "linux._3_11" failed
linux (3.10)
The operation was canceled.
linux (3.10)
The strategy configuration was canceled because "linux._3_11" failed