Skip to content

MeterReadings and references #80

@narve

Description

@narve

The MeterReading schema and endpoint descriptions, as defined by the UMEI standard, is also used for direct communication between FSPs and DSOs. This integration revealed some missing information in our data model.

A MeterReading can be connected either to a portfolio (as defined in UMEI), or to "something else"; typically an asset (part of a portfolio), an asset grid assignment (the link between an asset and the physical grid), a MPID (metering point ID), a grid node id, etc.

The MeterReading model does not account for this. While direct FSP and DSO communication is not covered by the UMEI protocol, it would be good if the protocol can be used as widely as possible. In any case the integration of the market participants in the eUniversal projects are important for a successful completion of the project. Hence we should see if we find a way to solve this problem.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions