-
Notifications
You must be signed in to change notification settings - Fork 10
Open
Description
As discussed in essay[1], I suppose that the MCF type of this project is to compute the max multicommodity concurrent flow, which try to maximize lambda to maximize lambda * demand.
When I set the demand of toy1.network to 100, I assume that the result will be 10%, because only part of the demand can arrive at termination. However, the programming end with an infeasible solution warning.
Reactions are currently unavailable
Metadata
Metadata
Assignees
Labels
No labels