What
The Tool Management Plan describes the Tool Evaluation and Tool Qualfication procedures, this includes:
How
Initial Tool list identified by the PR, #2497. Must be validated and based on result Tool evaluation can be started
Estimates for realization
12 man months minimum (based on the assumtion that for several tools existing tool qualifications can be re-used)
Category
Requirements / Architecture
What
The Tool Management Plan describes the Tool Evaluation and Tool Qualfication procedures, this includes:
How
Initial Tool list identified by the PR, #2497. Must be validated and based on result Tool evaluation can be started
Estimates for realization
12 man months minimum (based on the assumtion that for several tools existing tool qualifications can be re-used)
Category
Requirements / Architecture