-
Notifications
You must be signed in to change notification settings - Fork 0
36 lines (30 loc) · 861 Bytes
/
test.yml
File metadata and controls
36 lines (30 loc) · 861 Bytes
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
name: test
on:
push:
branches: [main, master]
pull_request:
branches: [main, master]
jobs:
test:
name: Python ${{ matrix.python }} on ${{ matrix.os }}
runs-on: ${{ matrix.os }}
strategy:
fail-fast: false
matrix:
os: [ubuntu-latest, macos-latest, windows-latest]
python: ['3.10', '3.11', '3.12']
steps:
- uses: actions/checkout@v4
- uses: actions/setup-python@v5
with:
python-version: ${{ matrix.python }}
- name: Install pytest
run: python -m pip install --upgrade pip pytest
- name: Run unit tests (pytest)
run: pytest tests/ -v
- name: Run unit tests (direct, no pytest)
shell: bash
run: |
python tests/test_cp_validator.py
python tests/test_dcma14.py
python tests/test_cp_forensic.py