Skip to content

Copilot code review

Copilot code review #3

Triggered via dynamic January 29, 2026 23:00
Status Success
Total duration 3m 42s
Artifacts

copilot-pull-request-reviewer

on: dynamic
Matrix: CodeQL analysis
Upload results
6s
Upload results
Cleanup artifacts
4s
Cleanup artifacts
Fit to window
Zoom out
Zoom in

Annotations

2 warnings
CodeQL analysis (python)
Feature flags do not specify a default CLI version. Falling back to the CLI version shipped with the Action. This is 2.24.0.
CodeQL analysis (python)
This run of the CodeQL Action does not have permission to access the CodeQL Action API endpoints. As a result, it will not be opted into any experimental features. This could be because the Action is running on a pull request from a fork. If not, please ensure the workflow has at least the 'security-events: read' permission. Details: Resource not accessible by integration - https://docs.github.com/rest