-
Notifications
You must be signed in to change notification settings - Fork 0
Expand file tree
/
Copy pathContainerfile
More file actions
48 lines (40 loc) · 1.99 KB
/
Containerfile
File metadata and controls
48 lines (40 loc) · 1.99 KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
# Use the same base image version as the clams-python python library version
FROM ghcr.io/clamsproject/clams-python-ffmpeg-torch2:1.0.9
# See https://github.com/orgs/clamsproject/packages?tab=packages&q=clams-python for more base images
# IF you want to automatically publish this image to the clamsproject organization,
# 1. you should have generated this template without --no-github-actions flag
# 1. to add arm64 support, change relevant line in .github/workflows/container.yml
# * NOTE that a lots of software doesn't install/compile or run on arm64 architecture out of the box
# * make sure you locally test the compatibility of all software dependencies before using arm64 support
# 1. use a git tag to trigger the github action. You need to use git tag to properly set app version anyway
################################################################################
# DO NOT EDIT THIS SECTION
ARG CLAMS_APP_VERSION
ENV CLAMS_APP_VERSION ${CLAMS_APP_VERSION}
################################################################################
################################################################################
# clams-python base images are based on debian distro
# install more system packages as needed using the apt manager
################################################################################
# Configure apt and install packages (FROM EASYOCR DOCKERFILE)
RUN apt-get update -y && \
apt-get install -y \
libglib2.0-0 \
libsm6 \
libxext6 \
libxrender-dev \
libgl1-mesa-dev \
git \
# cleanup
&& apt-get autoremove -y \
&& apt-get clean -y \
&& rm -rf /var/lib/apt/lists
################################################################################
# main app installation
WORKDIR /app
COPY requirements.txt .
RUN pip3 install -r requirements.txt
COPY . .
# default command to run the CLAMS app in a production server
CMD ["python3", "app.py", "--production"]
################################################################################