Skip to content

chore: add missing turborepo dependency and remove test workflow #7

chore: add missing turborepo dependency and remove test workflow

chore: add missing turborepo dependency and remove test workflow #7

Triggered via push February 10, 2026 14:48
Status Cancelled
Total duration 2m 47s
Artifacts

ci.yml

on: push
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 2 warnings
build-ios
Canceling since a higher priority waiting request for CI-refs/heads/main exists
build-ios
The operation was canceled.
build-android
Canceling since a higher priority waiting request for CI-refs/heads/main exists
build-android
The operation was canceled.
CI
Canceling since a higher priority waiting request for CI-refs/heads/main exists
lint
Cache save failed.
build-android
Cache save failed.