Skip to content

build(deps): bump golang.org/x/mod from 0.24.0 to 0.32.0 #1231

build(deps): bump golang.org/x/mod from 0.24.0 to 0.32.0

build(deps): bump golang.org/x/mod from 0.24.0 to 0.32.0 #1231

Triggered via pull request January 12, 2026 21:03
Status Failure
Total duration 29s
Artifacts

test.yaml

on: pull_request
Vet Go code
12s
Vet Go code
Matrix: Test with Go
Matrix: Test with TinyGo
Matrix: Test with WebAssembly
Fit to window
Zoom out
Zoom in

Annotations

22 errors
Test with Go (1.24)
Process completed with exit code 1.
Test with Go (1.23)
The strategy configuration was canceled because "test-go._1_24" failed
Test with Go (1.23)
The operation was canceled.
Vet Go code
Process completed with exit code 1.
Test with TinyGo (1.24, 0.37.0)
Process completed with exit code 1.
Test with TinyGo (1.23, 0.36.0)
The strategy configuration was canceled because "test-tinygo._1_24_0_37_0" failed
Test with TinyGo (1.23, 0.36.0)
Process completed with exit code 1.
Test with TinyGo (1.23, 0.37.0)
The strategy configuration was canceled because "test-tinygo._1_24_0_37_0" failed
Test with TinyGo (1.23, 0.37.0)
Process completed with exit code 1.
Test with TinyGo (1.24, 0.36.0)
The strategy configuration was canceled because "test-tinygo._1_24_0_37_0" failed
Test with TinyGo (1.24, 0.36.0)
The operation was canceled.
Test with WebAssembly (1.23, 0.36.0)
Process completed with exit code 2.
Test with TinyGo (1.23, 0.35.0)
The strategy configuration was canceled because "test-tinygo._1_24_0_37_0" failed
Test with TinyGo (1.23, 0.35.0)
The operation was canceled.
Test with WebAssembly (1.23, 0.35.0)
The strategy configuration was canceled because "test-wasm._1_23_0_36_0" failed
Test with WebAssembly (1.23, 0.35.0)
Process completed with exit code 2.
Test with WebAssembly (1.23, 0.37.0)
The strategy configuration was canceled because "test-wasm._1_23_0_36_0" failed
Test with WebAssembly (1.23, 0.37.0)
Process completed with exit code 2.
Test with WebAssembly (1.24, 0.36.0)
The strategy configuration was canceled because "test-wasm._1_23_0_36_0" failed
Test with WebAssembly (1.24, 0.36.0)
Process completed with exit code 2.
Test with WebAssembly (1.24, 0.37.0)
The strategy configuration was canceled because "test-wasm._1_23_0_36_0" failed
Test with WebAssembly (1.24, 0.37.0)
The operation was canceled.