-
Notifications
You must be signed in to change notification settings - Fork 0
Expand file tree
/
Copy pathindex.xml
More file actions
79 lines (62 loc) · 5.29 KB
/
index.xml
File metadata and controls
79 lines (62 loc) · 5.29 KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
<?xml version="1.0" encoding="utf-8" standalone="yes" ?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<channel>
<title>bcdata colloquium</title>
<link>http://bcdata.ca/index.xml</link>
<description>Recent content on bcdata colloquium</description>
<generator>Hugo -- gohugo.io</generator>
<language>en-us</language>
<copyright>2017 bcdata.ca -- All Rights Reserved.</copyright>
<lastBuildDate>Wed, 01 Feb 2017 15:00:00 +0000</lastBuildDate>
<atom:link href="http://bcdata.ca/index.xml" rel="self" type="application/rss+xml" />
<item>
<title>A risk-based platform for accident prevention strategies</title>
<link>http://bcdata.ca/post/20170201-kim-coleman/</link>
<pubDate>Wed, 01 Feb 2017 15:00:00 +0000</pubDate>
<guid>http://bcdata.ca/post/20170201-kim-coleman/</guid>
<description><p><strong>Speakers:</strong> <a href="https://www.linkedin.com/in/soyeankim">Soyean Kim</a> and <a href="https://www.linkedin.com/in/jeff-coleman-0b577926">Jeff Coleman</a> of <a href="http://www.safetyauthority.ca/">BC Safety Authority</a>.
<strong>Location:</strong> <a href="https://goo.gl/maps/weMH9h5SmPT2">Earth Sciences Building</a> ESB 5104, 3pm &ndash; 4pm.</p>
<p><img src="http://bcdata.ca/img/bc-safety-authority.png" alt="BC Safety Authority logo" height="30" width="" align="right"></p>
<p><strong>Abstract:</strong> BC Safety Authority’s accident prevention strategy follows a risk based platform, called “bow tie” for ongoing management and prevention of major incidents. The bow tie method draws on the direct experience of safety management team and the data collected from various safety oversight programs in order to identify hazards and to properly incorporate critical controls into management systems. In addition, it raises awareness and improves understanding and risk knowledge of the potential major incidents and the reliance on critical controls that prevent those accidents from occurring. Opportunities exist for greater connectivity among various databases to maximize the risk knowledge, especially the pre incident data based on inspections and post incident data.</p>
</description>
</item>
<item>
<title>bcdata colloquium introduction</title>
<link>http://bcdata.ca/post/20170129-introduction/</link>
<pubDate>Sun, 29 Jan 2017 23:42:55 -0800</pubDate>
<guid>http://bcdata.ca/post/20170129-introduction/</guid>
<description>
<h1 id="2017-bcdata-colloquium">2017 bcdata colloquium</h1>
<h2 id="schedule">Schedule</h2>
<p>Below is a table with the schedule for the BCData Colloquium. Note that titles and abstracts in the bottom-most table correspond to the first table via &ldquo;Talk Number&rdquo;.</p>
<p>|Talk Number | Date | Location | Speaker | Affiliation |
|&mdash;&mdash;&mdash;&mdash;|&mdash;&mdash;&mdash;&ndash;|&mdash;&mdash;&mdash;-|&mdash;&mdash;&mdash;&mdash;&mdash;&mdash;&mdash;&mdash;&mdash;&ndash;|&mdash;&mdash;&mdash;&mdash;&mdash;&mdash;&mdash;|
| 1 | Wed 1 Feb | ESB 5104 | Soyean Kim and Jeff Coleman | BC Safety Authority |</p>
<table>
<thead>
<tr>
<th>Talk Number</th>
<th>Title</th>
<th>Abstract</th>
</tr>
</thead>
<tbody>
<tr>
<td>1</td>
<td>A risk-based platform for accident prevention strategies</td>
<td>BC Safety Authority’s accident prevention strategy follows a risk based platform, called “bow tie” for ongoing management and prevention of major incidents. The bow tie method draws on the direct experience of safety management team and the data collected from various safety oversight programs in order to identify hazards and to properly incorporate critical controls into management systems. In addition, it raises awareness and improves understanding and risk knowledge of the potential major incidents and the reliance on critical controls that prevent those accidents from occurring. Opportunities exist for greater connectivity among various databases to maximize the risk knowledge, especially the pre incident data based on inspections and post incident data.</td>
</tr>
<tr>
<td>2</td>
<td></td>
<td></td>
</tr>
</tbody>
</table>
<h2 id="organizers-and-sponsors">Organizers and sponsors</h2>
<p>Organizers include (but are not limited to): the Institute of Applied Mathematics; PIMS; the Mathematics of Information group at UBC.</p>
<p>This series is co-sponsored by <a href="http://www.canssi.ca">CANSSI</a>, the <a href="https://dsi.ubc.ca">Data Sciences Institute</a>, the <a href="http://www.iam.ubc.ca">Institute of Applied Mathematics</a> and <a href="https://www.pims.math.ca/">PIMS</a></p>
</description>
</item>
</channel>
</rss>