Skip to content

Code Sync Up

Code Sync Up #1

Triggered via push June 18, 2025 15:58
Status Failure
Total duration 44s
Artifacts

test.yml

on: push
Matrix: Run
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Run (3.12)
Process completed with exit code 2.
Run (3.9)
Process completed with exit code 2.
Run (3.9)
The strategy configuration was canceled because "run._3_12" failed
Run (3.11)
The operation was canceled.
Run (3.11)
The strategy configuration was canceled because "run._3_12" failed
Run (3.10)
The operation was canceled.
Run (3.10)
The strategy configuration was canceled because "run._3_12" failed