Practically, it is the percentage of red, masked area to the total area in the light curve plot.
It will be a useful tool to visualize how much more observations are needed, and if the goal of e.g. covering 90% of the light curve has been reached.
As a follow-up feature, all the percentage from targets in a given observing program could be averaged to see what is the total progress of the program.
Practically, it is the percentage of red, masked area to the total area in the light curve plot.
It will be a useful tool to visualize how much more observations are needed, and if the goal of e.g. covering 90% of the light curve has been reached.
As a follow-up feature, all the percentage from targets in a given observing program could be averaged to see what is the total progress of the program.