Last updated: 2026-02-25 Primary goal: production-ready TrustSignal verification platform with a clear path to ICE Mortgage Technology / Encompass marketplace integration.
- Deliver a secure, stable verification platform that title companies and lenders can run in pilot with low operational risk.
- Produce the integration, security, and operational artifacts required for ICE/Encompass marketplace readiness.
- Preserve useful existing work (security controls, verification flows, pilot docs) while de-prioritizing speculative features that do not unblock pilot or marketplace acceptance.
Success criteria:
- Pilot gates pass with staging evidence, not just local test evidence.
- ICE/Encompass integration contract, implementation, and validation pack are complete.
- Security and operations controls are demonstrably enforced in production-like environments.
- Source-of-truth and legal/compliance docs consistently describe a simulator-first posture and strict boundaries.
- Security posture has strong in-repo controls, but production gate remains blocked on infra evidence and operational controls.
- Documentation has drift and duplication:
- duplicated architecture summaries in canonical docs and legacy docs
- mixed SQLite-vs-PostgreSQL assumptions across docs
- mixed anchor network defaults across older docs/notebooks
- old and new API contracts documented in parallel
Objective: move from "verified in test" to "verified in staging/pilot operations."
In scope:
- Close production gate blockers in the governance tracker:
- secrets hygiene and rotation evidence
- PostgreSQL TLS/encryption attestation in staging
- HTTPS ingress proof (cert chain, TLS policy, forwarded proto behavior)
- baseline monitoring/alerts/status surface
- Stabilize critical API paths:
- verify/receipt/revoke behavior and schema consistency
- strict request validation and auth on all public paths
- cross-tenant isolation regression coverage
- Pilot operations package:
- updated pilot handbook + title user guide
- incident response runbook updated to current architecture
- data retention/destruction controls mapped to implemented jobs/config
Out of scope:
- advanced ZKP and multi-chain portability work not required for pilot safety
Deliverables:
- Pilot Readiness Checklist (evidence-backed)
- Staging Evidence Bundle (security + reliability)
- Pilot Runbook Pack (ops, incident, support escalation)
Exit gate:
- Pilot Go/No-Go signoff from product + engineering + security owner.
Objective: make integration and operations package acceptable for marketplace onboarding.
In scope:
- Integration contract and adapter behavior:
- API contract for Encompass-facing flows
- auth, idempotency, error semantics, retry behavior, versioning policy
- eventing/webhook behavior and failure handling
- Marketplace documentation package:
- installation/configuration guide
- operational support model and escalation SLAs
- security questionnaire response set and architecture packet
- legal/policy docs aligned to real deployed behavior
- Reliability and release controls:
- SLOs, dashboards, alerts, status endpoint/page
- rollback and incident drills
- reproducible release checklist and evidence archive
Out of scope:
- non-essential feature expansion that does not improve integration reliability or acceptance
Deliverables:
- ICE/Encompass Integration Specification
- Marketplace Submission Pack
- Integration Test and Reliability Report
Exit gate:
- Marketplace Submission Ready review completed with no unresolved P1 blockers.
Objective: harden for scale and reduce long-term operational/security risk after integration readiness.
In scope:
- Key management uplift (KMS/HSM path and rotation automation)
- Supply-chain hardening and dependency governance
- Architecture/documentation cleanup:
- remove duplicate/stale docs
- enforce a single canonical API contract and architecture source
- Deferred advanced features (only after business-critical readiness):
- real ZKP implementation (replace mock)
- portability/multi-chain expansion
- deeper fraud analytics and OCR-assisted checks
Deliverables:
- GA Hardening Roadmap and completion evidence
- Refactor plan with migration and rollback notes
Exit gate:
- GA Hardening Complete signoff with audited controls and stable operations.
- No secrets in code or git history; rotation evidence for all previously exposed credentials.
- No cross-tenant access paths.
- No production DB deployment without TLS and encrypted-at-rest verification.
- No undocumented public API behavior differences between implementation and docs.
- No PII or sensitive payload leakage in logs or on-chain anchors.
- Security and reliability blockers.
- Pilot operability and support readiness.
- ICE/Encompass integration contract and validation.
- Marketplace package completeness and release discipline.
- Post-marketplace hardening and refactors.
Keep and actively use:
docs/PRODUCTION_GOVERNANCE_TRACKER.mdSECURITY.mddocs/verification.mddocs/final/01_EXECUTIVE_SUMMARY.mddocs/final/02_ARCHITECTURE_AND_BOUNDARIES.mddocs/final/03_SECURITY_AND_COMPLIANCE_BASELINE.mddocs/final/04_OPERATIONS_AND_SUPPORT.mddocs/final/05_API_AND_INTEGRATION_GUIDE.mddocs/final/06_PILOT_AND_MARKETPLACE_READINESS.mddocs/legal/*.md
Update/merge into canonical plan and current architecture reality:
docs/README.mddocs/archive/README.md- duplicated architecture summaries in root and legacy docs
De-prioritize until Phase 3:
- items in
docs/archive/legacy-2026-02-25/notebook/deedshield_v2_notebook.mdrequiring mock-to-real ZKP conversion or portability expansion - older lab notebook implementation details in
docs/archive/legacy-2026-02-25/lab-notebook/*except where they provide concrete test evidence needed for audit trails
- Weekly governance review against phase exit gates.
- Each major workstream must provide:
- design/risk delta
- minimal code diff
- tests (happy + abuse/failure)
- ops documentation updates
- evidence artifact references