Skip to content

Commit b30dafb

Browse files
author
DavidQ
committed
Plan completion of Level 18 and 19 before Level 20
PLAN_PR_LEVEL_19_12_COMPLETE_REMAINING_18_19
1 parent 78392f1 commit b30dafb

4 files changed

Lines changed: 106 additions & 8 deletions

File tree

docs/dev/CODEX_COMMANDS.md

Lines changed: 10 additions & 6 deletions
Original file line numberDiff line numberDiff line change
@@ -1,13 +1,17 @@
11
MODEL: GPT-5.4-codex
2-
REASONING: low
2+
REASONING: medium
33

44
COMMAND:
5-
1. Add Level 20 section to roadmap:
5+
1. Review roadmap:
66
docs/dev/roadmaps/MASTER_ROADMAP_HIGH_LEVEL.md
77

8-
2. Insert exactly as defined in PLAN
8+
2. Identify remaining [ ] and [.] in Level 18 and 19
99

10-
3. Do not modify other sections
10+
3. DO NOT modify yet
1111

12-
4. Package ZIP:
13-
<project folder>/tmp/PLAN_PR_LEVEL_20_1_NEXT_PHASE_DEFINITION.zip
12+
4. Prepare next BUILD PR:
13+
- finish Level 18 last item
14+
- validate Level 19 completion
15+
16+
5. Package ZIP:
17+
<project folder>/tmp/PLAN_PR_LEVEL_19_12_COMPLETE_REMAINING_18_19.zip

docs/dev/COMMIT_COMMENT.txt

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -1,3 +1,3 @@
1-
Define Level 20 roadmap phase
1+
Plan completion of Level 18 and 19 before Level 20
22

3-
PLAN_PR_LEVEL_20_1_NEXT_PHASE_DEFINITION
3+
PLAN_PR_LEVEL_19_12_COMPLETE_REMAINING_18_19
Lines changed: 41 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,41 @@
1+
# PLAN_PR_LEVEL_19_12_COMPLETE_REMAINING_18_19 Inventory
2+
3+
## Level 18 Remaining `[.]` / `[ ]`
4+
- [ ] Some games are actually samples/demos; identify and recommend a `phase-xx` move target.
5+
- [ ] Lock APIs
6+
- [ ] Clean boundaries
7+
- [ ] Document contracts
8+
- [.] Track A: verify all `games/` use engine systems
9+
- [ ] Track A: remove sample-specific logic from engine paths
10+
- [.] Track B: enforce engine vs shared vs game vs tool boundaries
11+
- [.] Track B: eliminate cross-layer leakage
12+
- [.] Track B: validate dependency direction rules across repo
13+
- [ ] Track B: remove accidental coupling
14+
- [.] Track C: finalize engine public APIs
15+
- [.] Track C: finalize shared contracts
16+
- [ ] Track C: ensure selectors/providers are stable
17+
- [.] Track C: remove unstable or experimental surfaces
18+
- [ ] Track D: single class per file enforcement
19+
- [ ] Track D: remove duplicate helpers
20+
- [ ] Track D: normalize naming consistency
21+
- [ ] Track D: eliminate import/export anti-patterns
22+
- [ ] Track E: flatten CSS layers
23+
- [ ] Track E: enforce shared UI classes
24+
- [ ] Track E: remove redundant styles
25+
- [ ] Track F: docs organization/classification/consolidation/remove move-only/alignment
26+
- [ ] Track G: import-export cleanup, `.keep`/empty folder cleanup, ownership, structure
27+
- [ ] Track H: capability-level PR bundling and fragmentation reduction
28+
29+
## Level 19 Remaining `[.]` / `[ ]`
30+
- [ ] Track B: validate boot-run-shutdown lifecycle
31+
- [ ] Track B: validate hot reload/reset flows
32+
- [ ] Track B: validate error handling paths
33+
- [ ] Track B: validate long-running stability
34+
- [ ] Track D: ensure all systems expose debug data
35+
- [ ] Track E: verify tools integrate cleanly with engine
36+
- [ ] Track E: validate asset pipelines end-to-end
37+
- [ ] Track E: validate editor-runtime consistency
38+
- [ ] Track E: confirm no tool-specific logic leaks into engine
39+
40+
## Notes
41+
- This file is analysis-only; no roadmap modification performed.
Lines changed: 53 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,53 @@
1+
# PLAN_PR_LEVEL_19_12_COMPLETE_REMAINING_18_19
2+
3+
## Purpose
4+
Close the active Level 18 overlay hardening lane by finishing the last in-scope item, then run completion validation for Level 19 with status-only roadmap promotion when execution evidence is clean.
5+
6+
## Scope
7+
- Docs-first BUILD target definition only
8+
- No runtime/engine implementation in this PLAN
9+
- No repo-wide cleanup
10+
11+
## Current Status Snapshot (from roadmap)
12+
- Level 18 has many long-horizon planned tracks, but the active execution lane indicates one remaining in-scope closure item in the engine-usage/boundary hardening slice.
13+
- Level 19 has Track A/C/F complete and promoted; Tracks B/D/E still show planned items and require explicit validation evidence before any broader promotion.
14+
15+
## Proposed Next BUILD
16+
`BUILD_PR_LEVEL_19_12_COMPLETE_REMAINING_18_19`
17+
18+
### Objective A — Finish Level 18 Last In-Scope Item
19+
- Complete the final active Level 18 overlay-slice closure item with the smallest testable delta.
20+
- Keep changes bounded to overlay/runtime hardening surfaces already in-progress.
21+
- Do not expand into unrelated Level 18 planned tracks.
22+
23+
### Objective B — Validate Level 19 Completion State
24+
- Execute validation focused on Level 19 completion criteria for already-implemented lanes.
25+
- Produce evidence report mapping each Level 19 track item to pass/fail/blocked.
26+
- Promote roadmap markers only where execution evidence exists.
27+
- Leave blocked or unvalidated items unchanged.
28+
29+
## Constraints
30+
- One PR purpose only: close active Level 18 slice + validate/promote Level 19 status safely.
31+
- Do not modify `start_of_day` folders.
32+
- Preserve existing working-tree changes.
33+
- Status-only roadmap updates (`[ ]`, `[.]`, `[x]`) and only for directly validated items.
34+
- Smallest scoped valid tests only.
35+
36+
## Validation Targets (for BUILD)
37+
- `npm test`
38+
- `node ./scripts/run-node-tests.mjs`
39+
- `npm run test:launch-smoke`
40+
- Any focused overlay/runtime tests touched by the Level 18 closure item
41+
42+
## Required BUILD Outputs
43+
- Implementation/status changes for the in-scope Level 18 item
44+
- Roadmap status marker updates for directly validated Level 19 items only
45+
- `docs/dev/reports/change_summary.txt`
46+
- `docs/dev/reports/validation_checklist.txt`
47+
- `docs/dev/reports/file_tree.txt`
48+
- `docs/dev/reports/BUILD_PR_LEVEL_19_12_COMPLETE_REMAINING_18_19_evidence.md`
49+
50+
## Exit Criteria
51+
- The final active Level 18 in-scope item is complete and validated.
52+
- Level 19 completion state is evidence-backed and roadmap markers are accurate.
53+
- No unrelated code/doc churn.

0 commit comments

Comments
 (0)