Skip to content

Commit 76b4509

Browse files
author
DavidQ
committed
Final confirmation of engine/tool boundary integrity (Phase 19 closeout)
BUILD_PR_LEVEL_19_25_ENGINE_TOOL_BOUNDARY_FINAL_CONFIRMATION
1 parent 6dbceeb commit 76b4509

6 files changed

Lines changed: 81 additions & 14 deletions

docs/dev/CODEX_COMMANDS.md

Lines changed: 8 additions & 9 deletions
Original file line numberDiff line numberDiff line change
@@ -1,13 +1,12 @@
11
MODEL: GPT-5.3-codex
22
REASONING: high
33

4-
Execute BUILD_PR_LEVEL_19_24_ENGINE_TOOL_LEAK_REMEDIATION_GATE:
4+
Execute BUILD_PR_LEVEL_19_25_ENGINE_TOOL_BOUNDARY_FINAL_CONFIRMATION:
55

6-
1. Read validation output from 19_23
7-
2. If violations exist:
8-
- remove tool-specific dependencies from src/engine
9-
- relocate logic to tools or shared layers
10-
- preserve engine contracts
11-
3. Re-run boundary validation
12-
4. Output final report to docs/dev/reports
13-
5. Produce ZIP artifact
6+
1. Re-run boundary validation across src/engine
7+
2. Confirm no tool-specific logic remains
8+
3. Cross-check previous violation reports
9+
4. Produce final confirmation report
10+
5. If clean:
11+
- update roadmap status [ ] -> [x] for Track E final item
12+
6. Do not modify any other roadmap text

docs/dev/COMMIT_COMMENT.txt

Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -1,3 +1,3 @@
1-
Engine/tool leak remediation gate (Phase 19 closeout)
1+
Final confirmation of engine/tool boundary integrity (Phase 19 closeout)
22

3-
BUILD_PR_LEVEL_19_24_ENGINE_TOOL_LEAK_REMEDIATION_GATE
3+
BUILD_PR_LEVEL_19_25_ENGINE_TOOL_BOUNDARY_FINAL_CONFIRMATION
Lines changed: 47 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,47 @@
1+
# BUILD_PR_LEVEL_19_25_ENGINE_TOOL_BOUNDARY_FINAL_CONFIRMATION Report
2+
3+
Date: 2026-04-17
4+
Scope: Final docs-only confirmation gate for Phase 19 Track E (`confirm no tool-specific logic leaks into engine`).
5+
6+
## Inputs Cross-Checked
7+
- `docs/dev/reports/BUILD_PR_LEVEL_19_23_ENGINE_TOOL_BOUNDARY_LEAK_VALIDATION_report.md`
8+
- `docs/dev/reports/BUILD_PR_LEVEL_19_24_ENGINE_TOOL_LEAK_REMEDIATION_GATE_report.md`
9+
10+
## Historical Comparison
11+
- 19_23: **FAIL** for tool-specific logic in engine due to `src/engine/editor`, `src/engine/tooling`, `src/engine/pipeline`.
12+
- 19_24: Remediation moved those surfaces to `tools/shared/*`, removed legacy engine directories, and passed focused validation.
13+
14+
## Final Re-Validation (This PR)
15+
Validation target: `src/engine` only.
16+
17+
Checks executed:
18+
1. Legacy tool-layer directories present?
19+
- `src/engine/editor`
20+
- `src/engine/tooling`
21+
- `src/engine/pipeline`
22+
23+
2. Engine import leakage to tools?
24+
- any `import/require` references from `src/engine` into `/tools/`.
25+
26+
3. Engine import leakage to removed legacy layers?
27+
- any references to `/src/engine/editor/`, `/src/engine/tooling/`, `/src/engine/pipeline/` or local `./editor|./tooling|./pipeline` patterns.
28+
29+
4. Known previously leaked tool symbols inside engine files?
30+
- `LevelEditor`, `TileMapEditor`, `EntityPlacementEditor`, `TimelineEditor`
31+
- `DeveloperConsole`, `RuntimeInspector`, `PropertyEditor`, `LiveTuningService`, `AssetBrowser`, `SceneGraphViewer`, `CapturePreviewRuntime`, `bootCapturePreview`
32+
- `AssetImportPipeline`, `TexturePreprocessPipeline`, `AudioPreprocessPipeline`, `ContentMigrationSystem`, `BuildAssetManifestSystem`, `ContentValidationPipeline`
33+
34+
Results:
35+
- `ENGINE_FILE_COUNT = 272`
36+
- `LEGACY_DIRS_PRESENT = 0`
37+
- `ENGINE_TO_TOOLS_IMPORTS = 0`
38+
- `ENGINE_LEGACY_LAYER_IMPORTS = 0`
39+
- `KNOWN_LEAK_SYMBOL_HITS = 0`
40+
41+
## Verdict
42+
- Final boundary confirmation: **PASS**
43+
- No tool-specific logic remains in `src/engine` per this validation gate.
44+
45+
## Roadmap Status
46+
- Track E final item is already set to `[x]` in `docs/dev/roadmaps/MASTER_ROADMAP_HIGH_LEVEL.md`.
47+
- No roadmap text or status marker changes were required in this PR.
Lines changed: 1 addition & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -1 +1 @@
1-
Docs-only remediation gate
1+
Docs-only final confirmation gate
Lines changed: 2 additions & 2 deletions
Original file line numberDiff line numberDiff line change
@@ -1,3 +1,3 @@
1-
[ ] violations removed
21
[ ] validation re-run
3-
[ ] pass confirmed
2+
[ ] zero violations
3+
[ ] roadmap status updated
Lines changed: 21 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,21 @@
1+
# BUILD_PR_LEVEL_19_25_ENGINE_TOOL_BOUNDARY_FINAL_CONFIRMATION
2+
3+
## Purpose
4+
Final confirmation that Phase 19 Track E is fully closed:
5+
no tool-specific logic exists in engine after remediation.
6+
7+
## Scope
8+
- docs-only
9+
- final validation gate
10+
- no implementation authored here
11+
12+
## Codex Responsibilities
13+
- run full boundary validation pass
14+
- confirm zero violations
15+
- cross-check against previous reports (19_23, 19_24)
16+
- produce final confirmation report
17+
18+
## Acceptance
19+
- zero violations confirmed
20+
- prior violations resolved
21+
- Phase 19 Track E can be marked [x]

0 commit comments

Comments
 (0)