Skip to content

Commit 1ab1c5a

Browse files
author
DavidQ
committed
PLAN: Level 11.7 Final Promotion Gate
- Defines promotion criteria - Prepares BUILD phase
1 parent fc30978 commit 1ab1c5a

5 files changed

Lines changed: 32 additions & 13 deletions

File tree

docs/dev/CODEX_COMMANDS.md

Lines changed: 2 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -1 +1,2 @@
1-
# No Codex command required for APPLY_PR
1+
# Next Step (not executed here)
2+
# BUILD_PR_LEVEL_11_7_FINAL_PROMOTION_GATE

docs/dev/COMMIT_COMMENT.txt

Lines changed: 3 additions & 4 deletions
Original file line numberDiff line numberDiff line change
@@ -1,5 +1,4 @@
1-
APPLY: Sample number normalization and formatting alignment
1+
PLAN: Level 11.7 Final Promotion Gate
22

3-
- Sequential numbering corrected
4-
- Formatting standardized
5-
- No file structure changes
3+
- Defines promotion criteria
4+
- Prepares BUILD phase
Lines changed: 2 additions & 3 deletions
Original file line numberDiff line numberDiff line change
@@ -1,5 +1,4 @@
11
CHANGE SUMMARY
22

3-
- Corrected sample numbering to be sequential
4-
- Standardized formatting across affected sample directories
5-
- No structural or file-level changes made
3+
- Introduced final promotion gate definition
4+
- Defined criteria and constraints for authoritative switch
Lines changed: 5 additions & 5 deletions
Original file line numberDiff line numberDiff line change
@@ -1,7 +1,7 @@
11
VALIDATION CHECKLIST
22

3-
[✔] Sample directories unchanged
4-
[✔] No files added, removed, or renamed
5-
[✔] Numbering is sequential and consistent
6-
[✔] Formatting aligned across corrected samples
7-
[✔] Index references match updated numbering (if applicable)
3+
[ ] Promotion criteria defined
4+
[ ] Stability thresholds defined
5+
[ ] Rollback conditions defined
6+
[ ] Observability requirements defined
7+
[ ] No runtime scope introduced
Lines changed: 20 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,20 @@
1+
# PLAN PR — Level 11.7 Final Promotion Gate
2+
3+
## Purpose
4+
Define the final promotion gate from passive to authoritative mode.
5+
6+
## Scope
7+
- Define promotion criteria
8+
- Define stability thresholds
9+
- Define rollback conditions
10+
- Define observability requirements
11+
12+
## Non-Goals
13+
- No runtime implementation
14+
- No refactors
15+
- No new systems
16+
17+
## Acceptance Criteria
18+
- Promotion conditions clearly defined
19+
- Validation steps explicit
20+
- No ambiguity for BUILD phase

0 commit comments

Comments
 (0)