Run 2 exhibited an issue with the drift field which adversely affects track/shower reconstruction in the East-East TPC and which is not easily modeled in the detector simulation. We need to decide whether to keep using the East Cryostat for the analysis or drop it.
This is likely to be an informed decision made by Angela and Alberto (but can't find their github ids so assigned to Elizabeth and Tracy).