Milestones

List view

  • This is a big week... we're getting ready for John Day workshops next week and a lot of new changes to code and cartography...

    Overdue by 7 year(s)
    Due by October 19, 2018
    3/3 issues closed
  • Generate a revised version of BRAT and associated summary products to help with restoration prioritization in the Marin watershed.

    Overdue by 7 year(s)
    Due by December 1, 2018
  • This task is to generate Beaver Restoration Assessment Tool (BRAT – http://brat.joewheaton.org) summary products in an atlas format for the Middle Columbia watershed .

    Overdue by 7 year(s)
    Due by October 15, 2018
    3/3 issues closed
  • This task is to generate Beaver Restoration Assessment Tool (BRAT – http://brat.joewheaton.org) summary products in an atlas format for the North Fork Burnt River watershed .

    Overdue by 7 year(s)
    Due by October 15, 2018
    2/2 issues closed
  • This task is to generate Beaver Restoration Assessment Tool (BRAT – http://brat.joewheaton.org) summary products in an atlas format for the entire John Day Basin (including Lower John Day, Middle Fork John Day, North Fork John Day, and the Upper John Day watersheds).

    Overdue by 7 year(s)
    Due by October 15, 2018
    2/2 issues closed
  • Complete run of latest BRAT on the 505 km of perennial streams (1:24K NHD) in the Middle Columbia watershed segmented at 300 m including: Existing (2014) Beaver Dam Capacity Estimates (dams /km) Historic Beaver Dam Capacity Estimates (dams /km) Potential for Human Beaver Conflict (probability) Preliminary Beaver Management, Restoration and Conservation Predictions Census (from imagery) of beaver dam locations for validation & additional capacity assessment

    Overdue by 7 year(s)
    Due by October 8, 2018
  • Complete run of latest BRAT on the 505 km of perennial streams (1:24K NHD) in the North Fork Burnt River watershed segmented at 250 m including: Existing (2014) Beaver Dam Capacity Estimates (dams /km) Historic Beaver Dam Capacity Estimates (dams /km) Potential for Human Beaver Conflict (probability) Preliminary Beaver Management, Restoration and Conservation Predictions

    Overdue by 7 year(s)
    Due by October 8, 2018
  • This project is for a complete Beaver Restoration Assessment Tool (BRAT – http://brat.joewheaton.org) analysis of the entire John Day Basin (including Lower John Day, Middle Fork John Day, North Fork John Day, and the Upper John Day watersheds). This will include calibration, verification and refinement of the BRAT models. Complete run of standard latest BRAT on the perennial portion of the 1:24K NHD network (11,279 KM of stream) segmented at 250 m including: Existing (based on 2014 LANDFIRE data, the most current data available) beaver dam capacity estimates (dams /km)

    Overdue by 7 year(s)
    Due by October 8, 2018
  • We have a ton of development we need to crank out before we return to batching Idaho BRAT, TNC BRAT, John Day BRAT, etc. We should get through this stuff by Mid-August for first cut. Then we can refine.

    Overdue by 7 year(s)
    Due by August 17, 2018
    7/7 issues closed
  • The rest of the scope: https://docs.google.com/spreadsheets/d/1yrGR4DNWIrMuSd-4fiKc4lBiRx4K5UWy4cmHfkMAVQM/edit#gid=584384841

    Overdue by 7 year(s)
    Due by September 14, 2018
    1/1 issues closed
  • From: https://docs.google.com/spreadsheets/d/1yrGR4DNWIrMuSd-4fiKc4lBiRx4K5UWy4cmHfkMAVQM/edit#gid=584384841 the next tier of priority basins.

    Overdue by 7 year(s)
    Due by August 10, 2018
  • From https://docs.google.com/spreadsheets/d/1yrGR4DNWIrMuSd-4fiKc4lBiRx4K5UWy4cmHfkMAVQM/edit#gid=584384841, thesea re the top 20 Basins.

    Overdue by 7 year(s)
    Due by July 27, 2018
  • Based on where Sara and Karen plan on validating TNC BRAT and doing field work, this would be provisional runs needed for that effort.

    Overdue by 7 year(s)
    Due by July 16, 2018
  • Preliminary BRAT run for all watersheds within the entire study area.

    Overdue by 7 year(s)
    Due by June 15, 2018
    5/5 issues closed
  • Overdue by 7 year(s)
    Due by September 28, 2018
    2/2 issues closed
  • We will make the jump to BRAT 4.0 when we find funding to make it a proper, professionally refactored Arc Add-In and standalone, that is fully Riverscapes compliant.

    Overdue by 7 year(s)
    Due by May 1, 2019
    2/2 issues closed
  • Many improvements and development to BRAT algorithms are planned over the Summer of 2018. The intermediate releases associated with all this will all be pre-releases or BETA. Once we've vetted and tested those, we will create a real latest release as 3.2.

    Overdue by 7 year(s)
    Due by November 2, 2018
    15/15 issues closed
  • Weber's ArcApps for Data Capture.

    Overdue by 7 year(s)
    Due by June 30, 2018
    4/4 issues closed