Skip to content

Merge pull request #83 from SentienceAPI/sdk_async2 #189

Merge pull request #83 from SentienceAPI/sdk_async2

Merge pull request #83 from SentienceAPI/sdk_async2 #189

Triggered via push January 1, 2026 16:08
Status Failure
Total duration 2m 43s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (ubuntu-latest, 20)
Process completed with exit code 1.
test (windows-latest, 20)
The strategy configuration was canceled because "test.ubuntu-latest_20" failed
test (windows-latest, 20)
The operation was canceled.
test (macos-latest, 20)
The strategy configuration was canceled because "test.ubuntu-latest_20" failed
test (macos-latest, 20)
The operation was canceled.