chore(master): release 2.1.0 #142
Triggered via pull request
September 15, 2025 07:52
Status
Failure
Total duration
1m 52s
Artifacts
–
pull_request.yaml
on: pull_request
security
28s
Build Image
25s
Matrix: Run eslint
Matrix: Run Integration Tests
Matrix: Run Unit Tests
Annotations
10 errors
|
Build Image
Process completed with exit code 1.
|
|
Run eslint (22.x)
Process completed with exit code 1.
|
|
Run eslint (20.x)
The operation was canceled.
|
|
Run eslint (20.x)
The strategy configuration was canceled because "eslint._22_x" failed
|
|
Run Integration Tests (20)
Process completed with exit code 1.
|
|
Run Integration Tests (22)
The operation was canceled.
|
|
Run Integration Tests (22)
The strategy configuration was canceled because "integration-test._20" failed
|
|
Run Unit Tests (20)
Process completed with exit code 1.
|
|
Run Unit Tests (22)
The operation was canceled.
|
|
Run Unit Tests (22)
The strategy configuration was canceled because "unit-test._20" failed
|