Project Manager Track — P3.Express-Based Methodology

Version: 0.1 · Status: Draft · Opt-in: Yes — skip if delivering internal product work without contract boundaries

A lightweight project governance layer that wraps Specorator feature deliveries when the team works in a service-provider context (delivering for clients). Based on P3.Express by Nader K. Rad and Frank Turley (Creative Commons licence, freely available at https://p3.express/manual/v2/).

For teams of 1–7 people, the micro.P3.Express variant applies automatically — it uses a weekly rather than monthly cadence and collapses the monthly B/E groups into the weekly rhythm. See §5 for details.


Table of contents

  1. When to use this track
  2. Relationship to the Specorator and Discovery Track
  3. Directory layout
  4. Project lifecycle and state machine
  5. P3.Express process map
  6. Processes and commands
  7. The four management documents
  8. The project-manager agent
  9. Method library
  10. Quality gates
  11. Usage guidelines

1. When to use this track

Run the Project Manager Track when any of these conditions apply:

  • You are delivering software to a client under a contract or statement of work.
  • You need to track scope, schedule, and budget across multiple features or sprints.
  • You have external stakeholders who need regular status reports.
  • You need formal change control — client requests become logged change items before work begins.
  • You need a project closure document for sign-off, invoicing, or handover.

Skip it when:

  • You are building an internal product where a product owner manages priorities informally.
  • Stakeholders have direct access to the backlog and do not need synthesised reports.
  • There is no contract boundary — the discovery + spec tracks cover the work.

2. Relationship to the Specorator and Discovery Track

flowchart TD
    pm["Project Manager Track<br/>projects/&lt;slug&gt;<br/>Project Description + Deliverables Map + Follow-Up Register + Health Register + weekly-log<br/>Owner: project-manager"]
    discovery["Discovery Track<br/>discovery/&lt;slug&gt;<br/>Frame -> ... -> Handoff"]
    spec["Specorator Lifecycle<br/>specs/&lt;slug&gt;<br/>Idea -> Research -> ... -> Retro"]

    pm -->|links to, never rewrites| discovery
    pm -->|links to, never rewrites| spec
    discovery -->|chosen brief| spec
Loading
  • The project-manager operates at the project envelope: scope, stakeholders, budget, risk/issue/change, periodic reporting.
  • Feature work is still built via the Specorator. The PM links to feature folders but never edits their artifacts.
  • Discovery sprints are still run via the Discovery Track. The PM logs them in the deliverables map as project phases.
  • The PM does not replace the pm agent (Stage 3) — that agent produces feature requirements. The project manager produces project governance documents.

3. Directory layout

projects/
└── <project-slug>/
    ├── project-state.md          # state machine (owned by /project:* commands)
    ├── project-description.md    # P3 Doc 1: scope, objectives, stakeholders, budget
    ├── deliverables-map.md       # P3 Doc 2: WBS, milestones, schedule, feature links
    ├── followup-register.md      # P3 Doc 3: risks + issues + changes + lessons (one register)
    ├── health-register.md        # P3 Doc 4: satisfaction scores, peer reviews, governance
    ├── weekly-log.md             # periodic C-group entries (append-only)
    ├── status-report.md          # client-facing RAG snapshot (replaced each /project:report run)
    └── project-closure.md        # Group F: handover, satisfaction, lessons, archive

Feature folders (specs/) and discovery folders (discovery/) remain at the repo root. The PM references them by relative path in deliverables-map.md; it never writes to them.


4. Project lifecycle and state machine

flowchart TD
    scaffolded["scaffolded"]
    initiating["initiating<br/>project-description + deliverables-map + followup-register + health-register"]
    executing["executing"]
    closing["closing<br/>project-closure.md drafted"]
    closed["closed"]
    post["post-project<br/>benefit evaluation"]

    scaffolded -->|/project:initiate| initiating
    initiating -->|go/no-go approved by sponsor| executing
    executing -->|/project:weekly recurring| executing
    executing -->|/project:report on demand| executing
    executing -->|changes and issues update followup-register| executing
    executing -->|/project:close| closing
    closing -->|client sign-off| closed
    closed -->|/project:post after 3-6 months| post
Loading

project-state.md records: current phase, linked feature folders, sponsor name, go/no-go history, and open blocking items.


5. P3.Express process map

P3.Express organises all management work into 33 activities across 7 groups (A–G). This track implements the micro.P3.Express variant, which suits teams of 1–7 people by using a weekly rather than monthly cadence.

Group When Key activities Track command
A — Initiation Once, at project start Appoint roles (A01–03); describe project (A04); plan deliverables (A05); identify risks (A06); peer review (A07); go/no-go (A08); kickoff (A09); focused comms (A10) /project:initiate
C — Weekly management Every week during executing Measure & report (C01); plan responses for deviations (C02); weekly kickoff (C03); focused comms (C04) /project:weekly
D — Daily management Any working day Manage follow-up items (D01); accept completed deliverables (D02) inline in /project:weekly; /project:report auto-picks up D02 via spec workflow-state
E — Periodic closure End of each period (monthly in full P3; end-of-sprint in micro) Stakeholder satisfaction (E01); lessons + improvement planning (E02); focused comms (E03) /project:weekly with end-of-period flag
F — Project closure Once, at engagement end Hand over product (F01); final satisfaction (F02); peer review (F03); archive (F04); celebrate (F05); focused comms (F06) /project:close
G — Post-project Every 3–6 months, up to 5 years after closure Evaluate benefits realised (G01); capture new ideas (G02); focused comms (G03) /project:post

The monthly B-group activities (plan revision, monthly go/no-go) are rolled into the weekly cadence in micro.P3.Express — see /project:weekly below.

Focused communication (A10, C04, E03, F06, G03) is not a soft skill appendage in P3.Express — it is a named, recurring activity. The PM agent produces a focused comms note at every major transition. The audience and channel are defined in project-description.md (stakeholder section).


6. Processes and commands

/project:start <slug> — Bootstrap

Scaffolds projects/<slug>/ and initialises project-state.md. The slug names the client or engagement, not the solution.

Good slugs: acme-portal-2026, coastal-insurance-migration, blue-labs-q3. Bad slugs: new-website, redesign, the-big-project.

Outputs: projects/<slug>/project-state.md


/project:initiate — Group A: Project Initiation

Produces the four foundational documents and gates on human approval (A08).

Procedure:

  1. Facilitate role-appointment check: confirm sponsor name and PM are recorded.
  2. Draft project-description.md from the client brief / statement of work (A04). Sections: purpose + expected benefits, expected cost and duration, in-scope and out-of-scope, requirements and quality expectations, stakeholder list with interest–influence mapping.
  3. Draft deliverables-map.md — hierarchy of deliverables (nouns, not tasks), with dependency sketch, acceptance criteria, and links to planned specs/ folders (A05).
  4. Seed followup-register.md with initial risks from the project constraints (A06).
  5. Self-check using the peer review lens (A07): are scope boundaries clear? Is every major risk captured? Does the deliverables map cover the full contracted scope?
  6. Present summary to the human for go/no-go (A08). Record decision in project-state.md.
  7. If approved: update project-state.md to executing. Draft a focused-comms note for the project kickoff (A09, A10) — append to weekly-log.md.

Outputs: project-description.md, deliverables-map.md, followup-register.md (initial), health-register.md (seeded) Gate: human sets initiation_status: approved in project-state.md.


/project:weekly — Groups C + D: Weekly Review

Appends a dated entry to weekly-log.md. Run once per week during executing.

Procedure:

  1. Read all linked specs/<slug>/workflow-state.md files. Summarise feature progress (D02 — accept or flag incomplete deliverables).
  2. Check followup-register.md for open risks, issues, and changes. Update statuses. Flag any item that has escalated or passed its response deadline (D01).
  3. Check schedule against deliverables-map.md. Calculate whether milestones are on track (C01). Compute a RAG status for schedule, scope, and budget.
  4. For any Amber or Red item, draft a response plan entry in followup-register.md (C02).
  5. Write the weekly entry in weekly-log.md (C03, C04): date, RAG summary, feature status table, open follow-up items, next-week focus, focused-comms note for stakeholders.
  6. At end-of-period (sprint boundary or monthly): append E01 satisfaction prompt note and E02 lessons note to weekly-log.md.

Outputs: one appended entry in weekly-log.md; updates to followup-register.md and health-register.md (E01 satisfaction notes).


/project:report — Status Report (on demand)

Produces a client-facing status-report.md. Unlike weekly-log.md (internal), the status report is synthesised for the client. Replaces the prior version on each run.

Format: project header, RAG traffic lights (schedule / scope / budget), milestone table (planned vs. actual), summary of open risks and issues, change requests in flight, next-milestone ETA, PM commentary.

Outputs: status-report.md (overwritten)


/project:close — Group F: Project Closure

Produces the project closure document when the engagement is complete (or formally cancelled).

Procedure:

  1. Confirm all deliverables have been accepted (D02 history in weekly-log.md).
  2. Hand-over section: what was delivered, what was out-of-scope, any known defects or follow-on work (F01).
  3. Final satisfaction scores: surface E01 history; add a final satisfaction note for the human to send to the client (F02).
  4. Peer-review self-check: are all follow-up items closed or formally carried forward? (F03)
  5. Archive pointer: note where final documents, code repos, and client communications are stored (F04).
  6. Lessons summary: aggregate lessons from all /project:weekly E02 entries (F04 addendum).
  7. Focused-comms note: closure announcement template (F06).

Outputs: project-closure.md Gate: human sets closure_status: accepted in project-state.md.


/project:post — Group G: Post-Project Evaluation (lazy)

Run 3–6 months after closure, and optionally repeated annually for up to 5 years. Evaluates whether the expected benefits described in project-description.md were actually realised.

Outputs: one appended entry in project-closure.md (benefits evaluation section).


7. The four management documents

P3.Express is deliberately minimal: four documents cover everything a project manager needs. The repo maps each to a markdown file.

7.1 Project Description (project-description.md)

The living charter. Created in /project:initiate (A04) and updated throughout the project when scope or budget changes are approved.

Sections:

  • Purpose and expected benefits — why this project exists and what value it will deliver.
  • Expected cost and duration — indicative budget and timeline. Not a contract; a baseline.
  • Scope — in-scope (explicit list of deliverables) and out-of-scope (explicit exclusions). Vague scope is a defect.
  • Requirements and quality expectations — key quality bars the deliverables must meet (links to specs/<slug>/requirements.md where applicable).
  • Stakeholders — list with role, interest, influence rating, and communication preference. The interest–influence matrix is the analytical tool (see §9.1).

The document is never frozen. Changes go through the follow-up register; approved changes are incorporated here with a dated change note.


7.2 Deliverables Map (deliverables-map.md)

The combined WBS and schedule. Created in /project:initiate (A05), refined weekly or monthly.

Structure:

  • Hierarchical list of deliverables expressed as nouns (products), not verbs (tasks).
  • Each deliverable: description, acceptance criteria, dependencies, feature folder link (specs/<slug>/), and target milestone.
  • Schedule view: milestones with target dates, baseline vs. actual.
  • Rolling-wave refinement: only the current sprint's items need full breakdown; future items can remain high-level.

7.3 Follow-Up Register (followup-register.md)

One register for all uncertain items. Risks, issues, change requests, and lessons all live here. This is the key P3.Express design choice: no routing friction between "is this a risk or an issue?"

Each entry:

  • type: risk | issue | change-request | lesson
  • description: what it is
  • cause: root cause or trigger
  • consequence: what happens if unmanaged
  • impact: H/M/L
  • response: planned action
  • custodian: owner (name or role)
  • status: open | in-progress | closed
  • dates: raised, target resolution, resolved

The register is updated in every /project:weekly run (D01). Lessons from period closures are also added here (E02).


7.4 Health Register (health-register.md)

Governance and satisfaction tracking. Updated at each period closure and at project start/end.

Sections:

  • Peer reviews — self-check notes from A07, B02 equivalent, F03: what was reviewed, findings, actions taken.
  • Satisfaction scores — end-of-period satisfaction ratings (from E01), kept anonymous and aggregated.
  • Improvement actions — actions generated from E02 lessons sessions, with owner and status.

8. The project-manager agent

.claude/agents/project-manager.md

Tools: Read, Edit, Write, WebSearch, WebFetch Model: sonnet

The project-manager agent shadows a human project manager in a service-provider context.

It operates at the project level — cross-feature, cross-sprint, cross-team.

It owns all artifacts under projects/<slug>/.

It links to but never edits specs/, discovery/, or .claude/.

It uses WebSearch/WebFetch for client-side research: public company information, market data, technology comparisons, and publicly available client references.

It does not:

  • Write requirements (that is the pm agent at Stage 3).
  • Design architecture (that is the architect agent at Stage 4–5).
  • Make scope or budget decisions — it surfaces issues and defers to the human sponsor.
  • Approve change requests — it documents, assesses impact, and escalates.

9. Method library

9.1 Stakeholder mapping: Interest–Influence matrix

Stakeholders in project-description.md are rated on a 2×2 grid:

Low interest High interest
High influence Keep satisfied Manage closely
Low influence Monitor Keep informed

Communication frequency and format derive from the quadrant:

  • Manage closely: include in major decisions; weekly touchpoint.
  • Keep satisfied: brief regularly; escalate before decisions affect them.
  • Keep informed: good feedback source; include in reviews and demos.
  • Monitor: newsletter-level comms; no input required on decisions.

9.2 Follow-up item assessment: four fields

Every new item in the follow-up register is assessed on four fields before it is actionable:

  1. Impact (H/M/L) — consequence if unmanaged.
  2. Response — avoid / mitigate / transfer / accept (risks) or escalate / fix / defer / accept (issues) or approve / reject / defer (changes).
  3. Custodian — the named person responsible for driving to resolution.
  4. Target date — when the response must be actioned or re-evaluated.

9.3 Status report: RAG traffic lights

Three dimensions rated Red / Amber / Green:

Dimension Green Amber Red
Schedule On track ≤2 weeks slippage >2 weeks slippage or milestone at risk
Scope Within agreed scope Minor additions under review Unapproved scope change in flight
Budget Within 5% variance 5–15% variance >15% variance or forecast overrun

9.4 Go/no-go gate: decision brief

At A08 and at each period renewal (B03 equivalent), the PM prepares a one-page decision brief for the human sponsor:

  • Current RAG status (schedule / scope / budget).
  • Top 3 risks and their mitigation status.
  • Upcoming milestone and whether the team has capacity to hit it.
  • Recommendation: continue / pause / close.

The agent surfaces the brief; the human makes the call.


10. Quality gates

Gate Condition Who checks
Initiation go/no-go Human sets initiation_status: approved in project-state.md Human sponsor
Weekly log quality Entry has: date, RAG, feature status, follow-up review, next-week focus project-manager self-check
Follow-up item completeness All four fields populated before item is tracked project-manager self-check
Status report accuracy RAG status derived from actual workflow-state.md reads, not invented project-manager self-check
Closure acceptance Human sets closure_status: accepted; all open follow-up items closed or formally carried forward Human sponsor

11. Usage guidelines

Starting a new engagement

1. /project:start <engagement-slug>
2. /project:initiate          # produces project-description + deliverables-map + followup-register
                               # → awaits human go/no-go
3. (kick off feature work via /spec:start and /discovery:start as normal)
4. /project:weekly             # every week during executing
5. /project:report             # when a client status update is due (on demand)
6. /project:close              # at engagement end → awaits human sign-off
7. /project:post               # 3–6 months later to evaluate benefits

Linking features to the project

In deliverables-map.md, reference feature folders:

| Deliverable | Spec folder | Milestone | Status |
|---|---|---|---|
| Authentication module | `specs/auth-redesign/workflow-state.md` | M1 — 2026-05-15 | In progress |

The project-manager reads workflow-state.md from each linked spec to report feature status in /project:weekly. It never writes to those files.

When the client brief is the project input

Go directly to /project:start/project:initiate. You do not need to run the Discovery Track unless the engagement explicitly includes an ideation or discovery phase. If it does, run /discovery:start and link the sprint from deliverables-map.md.

P3.Express references