Use a cross-version handoff when one release cycle produces quality signals, operator contracts, generated data, or other release evidence that a later cycle must consume.
The handoff contract lives with the consuming cycle, not the producing cycle. The producing cycle's release notes name what was shipped; the consuming cycle's handoff document names how downstream work must read and enforce it.
Place the handoff in the consuming version's specs folder:
specs/<next-version-slug>/v<previous-version>-handoff.md
For example, the v0.4 to v0.5 release-quality handoff lives at
specs/version-0-5-plan/v04-handoff.md.
Use the producing version as the filename prefix and keep the subject narrow:
v04-handoff.mdfor the main v0.4 to v0.5 release-quality handoff.v06-security-handoff.mdif a later cycle needs a narrower source-backed security handoff from v0.6.
Do not append the consuming contract to the producing release notes. The release notes are a ship record; the handoff is a forward-looking consumption contract.
A cross-version handoff must be linked in both directions:
- The producing cycle's
release-notes.mdlinks to the handoff from its validation baseline, known limitations, or changes section. - The consuming handoff links back to the producing release notes section that identifies the shipped surface.
- Any consuming tasks, specs, release-readiness checks, or operator guides link to the handoff rather than re-describing the upstream contract.
The precedent is v0.4 to v0.5:
- Producing release notes:
specs/version-0-4-plan/release-notes.md## Validation baseline for v0.5. - Consuming handoff:
specs/version-0-5-plan/v04-handoff.md.
The handoff should state:
- what the consuming cycle must read;
- where the source-of-truth implementation or generated data lives;
- which values are blocking gates, advisory signals, or operator-waivable conditions;
- how test fixtures should represent the handoff surface; and
- what is deliberately deferred or out of scope.
If the handoff describes script exports, generated data, diagnostic codes, or runtime semantics, reviewers should treat it as a doc-as-contract artifact and verify claims against the referenced source files.