Skip to content

feature/issue-345-bazel-build-go #622

feature/issue-345-bazel-build-go

feature/issue-345-bazel-build-go #622

Re-run triggered September 2, 2025 21:41
Status Failure
Total duration 1d 0h 0m 4s
Artifacts

integration-tests.yml

on: pull_request
Matrix: PR unit tests
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
PR unit tests (ubuntu-latest)
Process completed with exit code 2.
PR unit tests (macos-12)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
PR unit tests (ubuntu-latest)
Restore cache failed: Dependencies file is not found in /home/runner/work/container-structure-test/container-structure-test. Supported file pattern: go.sum