Skip to content

Bump actions/setup-python from 4 to 6 #71

Bump actions/setup-python from 4 to 6

Bump actions/setup-python from 4 to 6 #71

Triggered via pull request September 8, 2025 00:19
Status Failure
Total duration 1m 46s
Artifacts

test.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (3.10)
Process completed with exit code 1.
test (3.9)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_10" failed
test (3.11)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_10" failed
test (3.8)
The operation was canceled.
test (3.8)
The strategy configuration was canceled because "test._3_10" failed
test (3.12)
The operation was canceled.
test (3.12)
The strategy configuration was canceled because "test._3_10" failed