Dear authors,
I am trying to set up and run the software stack. I am installing it for a local Windows machine. My question is: how long does it usually take for the basic infrastructure to be ready (after running docker-compose up)? I think I need to give it more time, but I am not entirely sure if it is now getting stuck on something and has gone into a loop. Currently it's running for ~3hr.
Thanks in advance for your time and help,
Cheers
Dear authors,
I am trying to set up and run the software stack. I am installing it for a local Windows machine. My question is: how long does it usually take for the basic infrastructure to be ready (after running
docker-compose up)? I think I need to give it more time, but I am not entirely sure if it is now getting stuck on something and has gone into a loop. Currently it's running for ~3hr.Thanks in advance for your time and help,
Cheers