fix(divan_compat): do not capture drop with perf #721
Triggered via pull request
September 16, 2025 16:09
Status
Failure
Total duration
14m 50s
Artifacts
–
Annotations
4 errors and 1 notice
|
compat-integration-test-walltime (codspeed-divan-compat)
Process completed with exit code 101.
|
|
compat-integration-test-walltime (codspeed-divan-compat-examples)
The operation was canceled.
|
|
compat-integration-test-walltime (codspeed-divan-compat-examples)
The strategy configuration was canceled because "compat-integration-test-walltime.codspeed-divan-compat" failed
|
|
check
Process completed with exit code 1.
|
|
lint-windows
The windows-latest label will migrate from Windows Server 2022 to Windows Server 2025 beginning September 2, 2025. For more information see https://github.com/actions/runner-images/issues/12677
|