Skip to content

merge dev

merge dev #25

Triggered via push February 27, 2026 13:25
Status Failure
Total duration 36s
Artifacts

ci.yml

on: push
Lint (ruff)
8s
Lint (ruff)
Matrix: Unit Tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Unit Tests (3.10)
Process completed with exit code 1.
Unit Tests (3.11)
The strategy configuration was canceled because "test._3_10" failed
Unit Tests (3.11)
Process completed with exit code 1.
Unit Tests (3.12)
The strategy configuration was canceled because "test._3_10" failed
Unit Tests (3.12)
The operation was canceled.