Project Milestone 3: Design

This project milestone will focus on the design of your system.

High-level Design (4%)

Describe which architectural pattern you would use to structure the system. Justify your answer.

Low-level Design (4%)

Discuss which design pattern family might be helpful for implementing a specific subtask for this project. Justify your answer, providing a code or pseudocode representation and an informal class diagram.

Design Sketch (3%)

Design sketches provide a visual overview of the look and feel of your project. This may include but is not limited to one of the following:

  • Creating a wireframe mockup of your project user interface in action.
  • Creating a storyboard that illustrates a primary task that a user would complete with your project.

Provide a brief rationale (no more than 1 paragraph) explaining some of the design decisions for your program based on the provided sketch, and if/how it is different from what was presented during your lightning talk. Use concepts discussed in class to justify your design.

Process Deliverable III (3%)

The submission for this deliverable will depend on the specific SE process model your team plans to use to complete the group project. For your selected SE process, you must include a retrospective, sprint review of the previous milestone, and sprint planning for the next milestone. Example submissions include:

Process Sprint Review Sprint Planning
Prototyping stakeholder feedback and/or explanation of how the prototype changed since PM2 initial prototype of your system based on your project goal
Scrum submit notes for all teammates from at least weekly scrum meetings list of prioritized tasks for PM4
Kanban An updated Kanban board with completed PM3 tasks Backlog with prioritized tasks to complete for PM4
XP calculate project velocity (i.e., total function points per milestone) of the PM3 tasks planning poker and project velocity estimation for PM4
Spiral review of encountered and mitigated risks from PM3 identify PM4 objectives, anticipated risks, and how you plan to mitigate them
Waterfall N/A create an implementation plan [example]
  • If your process is not listed below, please contact Dr. Brown for an equivalent submission.

Project Check-In (1%)

Required: Complete this survey to provide an update on your team progress on the project so far this semester. Only one team member needs to complete this for the group.

Optional: Please complete this survey to provide an individual update on your team's progress separate from the group survey. You do not need to complete this for PM3.

Due: October 31 at 11:59pm

  • Design documentation (one document or separate well-labeled documents)
  • Process Deliverable III
  • Team Check-In survey